Loading…
Loading…
5,408 results • Latest
Construction of 2 nos 1.5m span RCC slab culvert at ch- I250m and 22 l0m including Slope stabilisation works to protect landslide and Surface Drainagc Works at different stretches from 0.00 K.M. to 2.37 K.M. of Gielle Factory to Khadka Dhura
Restoration of Flood Damaged road from Adampur Khal Par to Subaldha within Barabainan GP under Raina-II Block.
Construction of Strom water Drain Both Side(at ch 1370m to 1520m) and New 1000 mm dia HP Culvert (at ch 890m) At Baharpur - Bodhpur to Belkash - Singpur . within Burdwan I -Block
Construction of Strom water Drain Both Side ( at ch 1100m to 1340m )and Cross Drainage 1000 mm dia HP Work ( At ch 1230m, 2110m) At Kasthakuramba to Samanti within Burdwan II -Block
Construction of Single Cell 2 M X 2M Box Culvert ( at ch 570m, 1340m, 4270m) and Strom water Drain Work both side(at ch 2430m to 2820m)At Hatgobindapur to Debagram within burdwan II-Block
Development of Junction where lower hierarchy road (VR/ODR) meets hierarchy road (NH/SH/MDR/ODR) on 18 nos Rural Road under different blocks WBSRDA, Purba Bardhaman Division in the District of Purba Bardhaman as per Road Safety Audit Norms (under Roa