Loading…
Loading…
4,803 results • Latest
Permanent Restoration by way of construction of protection works and other allied works on PMGSY road from Jallian to Chelladhangri under Package No. Jk11-177 Block Mandi
Permanent Restoration by way of construction of protection works and other allied works on PMGSY road from Lassana to Bachianwali under Package No. Jk11-99 Block Lassana
Permanent Restoration by way of construction of protection works and other allied works on PMGSY road from Km 2nd of L032 Sanai Upper stage-II under Package No. Jk11-111 Block Surankote
Permanent Restoration by way of construction of protection works and other allied works on PMGSY road from Seri-Chouhana to Shiendara under Package No. Jk11-163 Block Mandi
Restoration of roads under the jurisdiction of PMGSY Division Poonch on emergency basis i.e. (Motorable paths only) by way of clearance of snow/slips works likely to occur during financial year 2026-27 (GROUP-6).
Restoration of roads under the jurisdiction of PMGSY Division Poonch on emergency basis i.e. (Motorable paths only) by way of clearance of snow/slips works likely to occur during financial year 2026-27 (GROUP-8).
Khari Sharbagni to Shagan Road under SASCI
Zenihal to Chachihal under SASCI
Ukhral to Bhingara Road under SASCI
Shalgadi to Panchal Road under SASCI
T01-Makerkote to Block Boundary Ukhral Road under SASCI
Chamalwas Neel Road Road under SASCI
Banihal to Mangit under SASCI
Banihal Lamber road under SASCI
Temporary Restoration of Roads by way of clearance of Slips/Snow for the Year 2026-27 (Sub-Division Billawar Group A)
Banihal to Chanchloo Road under SASCI
Temporary Restoration of Roads by way of clearance of Slips/Snow for the Year 2026-27 (Sub-Division Bani Group A)
Construction of 18 Mtr Span Single Lane Through Type Steel Motorable Bridge in Km 1st at RD 0/200 to 2/250 On L031 Chalog to Dhaman Pkg NoJK07-194
Construction of 18 Mtr Span Single Lane Through Type Steel Motorable Bridge in Km 7th RD 6/200 to 6/300 On L029 T01 to Balzadi Pkg NoJK07-243
Construction of 30 Mtr Span Single Lane Through Type Steel Motorable Bridge in Km 3rd at RD 2/025 to 2/075 On L024 T01 to Hathen Pkg NoJK07-199
Permanent Restoration of road from L043-Banjian to Nokan, Package No JK14-673 Length 6.900 km, Block Khoon under UT Capex 2025-26
Permanent Restoration of road from Chattrari to Maloti, Package No JK14-352, Stage-II, Phase-VIII, Block Kulwanta Length 6.00 km
Construction of road from Derul badshahi road to Bakhrabad village Culvert, Bhayaderul Jumma Masjid Under Nabagram Block (Length of the Road 2.368 Km)
Construction of Road from Talghoria Salam Sk house to Baghpara Selim Skmill via Baghmara high School via talgoria Primary school toAsraf khotib pond to BT Main road at Barla Villageunder Kriteswari GP under Nabagram Block (Length of the Road 1.680 K
Construction of road from Beunchitala transformer to football field via Choadanga at Gurudaspur G.P under Berhampore Block (Length of the Road 3.38 Km).
Construction of road from Surkhali bridge to sadal primary school Under Khargram Block (Length of the Road 5.300 Km)
Construction of road from Sahopara SH7 Shantipur to Sahibpam via Litton sk house and chandpur main road under Khargram Block (Length of the Road 2.610 Km)
Improvement of road from Bochagori Bridge to Tharutola via Angrabhasa Bonberi, Baggon under Goalpokher-I Block in the district of Uttar Dinajpur under RIDF-XXXI (Length of the road 11.701 Km)
Banihal to Dolegam under SASCI
Ukhral to Bhingara Road Package No JK04453 Length 13.10 Kms
Restoration of Noolie to Mughalpora,Package No.JK10-106.
Supplying Vehicle for Deputy Engineer No.02 PMGSY MRRDA Satara
PERIODIC MAINTENANCE OF KARWAR ILAKAL ROAD TO ICHANGI ROAD FROM CH 0.000 KM TO 1.200 KM IN SHIGGAON CONSTITUENCY OF HAVERI DISTRICT.(Package No KNMR 17-08)
Permanent Restoration on road froMm Drasoo to Guddar JK14379
Restoration of roads under the jurisdiction of PMGSY Division Kishtwar on emergency basis Km 25th Padder road to Bhagna road Bhagna to Dichla
Restoration of roads under the jurisdiction of PMGSY Division Kishtwar on emergency basis. Kandni Ohli Part-I, Kandni Ohli Part-II
Restoration of roads under the jurisdiction of PMGSY Division Kishtwar on emergency basis. Agral to Karool Karool to Badhat Agral to Lawa Duri to Ghan HSD road to Karool Gahan to Chandali
Permanent Restoration of Khunga to Kothi Jagir Road, Package No. JK19-3006, Upg., PMGSY-III, Block Gandhri, Distt. Ramban, Length 16.80 by way of construction of Semi pucca walling, crated walling HP Culverts with surface filling under SASCI
Restoration of roads under the jurisdiction of PMGSY Division Rajouri on emergency basis by way of clearance of slips/crates works likely to occur during financial year 2026-27on G13 i. Deeing to Mangiote, Package No.JK12-150,Length-4.30 Kms
Restoration of roads under the jurisdiction of PMGSY Division Rajouri on emergency basis by way of clearance of slips/crates works likely to occur during financial year 2026-27on G12 i.T03 km 28th to Seriah Package No JK12-145 ,Length 2.50Kms
Restoration of roads under the jurisdiction of PMGSY Division Rajouri on emergency basis by way of clearance of slips/Crates works likely to occur during financial year 2026-27 on G7i. T01 Km 39 to Dali Package No JK12-142 Length 6.00 Kms
Permanent Restoration of Dhalwas to Savni Karma Road, Package No. JK04-107, Stage-I, Block Batote, Distt. Ramban, Length 7.00 way of construction of Hume Pipe Culvert, Crated walling, Earth work by way of back cutting for 175 mtr length
Permanent restoration of Gool Dharam road km 5th to village Gundi Gaggarsulla, Package No. JK14-93, stage-1 , Block Gundi Dharam Distt. Ramban, Length 4.500 kms by way of construction of Crated walling in stretches under SASCI.
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 10 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 10 Year
As per NIT/ BOQ
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna andother scheme- Post 15 Year
Repair / maintenance of the Rural Roads/CDs for five years, constructed under Pradhan Mantri Gram Sadak Yojna and other scheme- Post 5 Year