Tirunelveli, Tamil Nadu·7d agoPublished 21 Sept 2026
SF6 Gas Handling Plant for Air evacuation, SF6 gas filling, recovery and purification, SF6 Storage Tank of 1000L capacity with weighing scale, SF6 Evacuation and Refilling Device
GeMProduct Custom Bid/RAsGoodsSF6 Gas Handling Plant for Air evacuation, SF6 gas filling
Supply Of M/S Parker Hannifin Make O Ring For PSS Stand Pipe Bottom Chamber (side) , Size: ID 231 Mm, Supply Of M/S Parker Hannifin Make O Ring For PSS Stand Pipe Flange (outer) , Size: ID 226.0 Mm X 3., Supply Of M/S Parker Hannifin Make O Ring For PSS Stand Pipe Flange (inner) , Size: ID 186.7 Mm X 3.
GeMProduct Custom Bid/RAsGoodsSupply of M/s Parker Hannifin make Super O lube 2 oz tube
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Custom Bid for Services - Operation Contract of Steam Boilers Similar Category Operation and Maintenance Power House/Power Plant Operation And Maintenance Of Other Machines And Plants
GeMService Bid/RAsServicesCustom Bid for Services - Operation Contract of Steam Boilers Similar Category Operation and Maintenance Power House/Power Plant Operation And Maintenance Of Other Machines And Plants
Grayloc Hub Lapping tool with industrial grey cast iron material & dimensions as per attached spec, C3 gauge for end fitting body as per drawing no. kaiga -3/31120 2023/DD., Burnishing Tool for Feeder grayloc hub design with preload arrangement. As per Drawing in spec.
GeMProduct Custom Bid/RAsGoodsGrayloc Hub Lapping tool with industrial grey cast iron
Cold End Gasket For The FM Vault And FM Service Area Viewing Window As Sketch I, Hot End Inner Gasket For FM Service Rea Viewing Window As Per The Sketch-KAPS- 1&2-21322-3, Spacer For FM Vault And FM Service Rea Viewing Window As Per The Sketch-KAPS- 1&2-21322-sketch-4
GeMProduct Custom Bid/RAsGoodscold end gasket for the FM vault and FM service area
Horticulture Service - Lumpsum based - General Maintenance of Garden/Lawn/Field/Nursery/Park; Site Clearing, Soil Preparation, General Maintenance of Plant (Mowing, Strimming, Laying, Sweeping, Watering, Weeding), Applying Fertilizers, Applying Pesti..
GeMService Bid/RAsServicesHorticulture Service - Lumpsum based - General Maintenance of Garden/Lawn/Field/Nursery/Park; Site Clearing
Facility Management Services - LumpSum Based - Industrial; Radiated Emission Test at RAPP-8 for a Panel at a Location-- for details refer BOQ item no 1 mentioned in scope of work and 1 lumsum quantity is equal to 61 having unit of measurement--- Numb.., Facility Management Services - LumpSum Based - Industrial; Conducted Emission Test at RAPP-8 for a Panel at a Location-- for details refer BOQ item no 2 mentioned in scope of work and 1 lumsum quantity is equal to 20 having unit of measurement--- Num..
GeMService Bid/RAsServicesFacility Management Services - LumpSum Based - Industrial; Radiated Emission Test at RAPP-8 for a Panel at a Location-- for details refer BOQ item no 1 mentioned in scope of work and 1 lumsum quantity is equal to 61 having unit of measurement--- Numb..