Loading…
Loading…
7,754 results • Latest
High-Vacuum Gas Sorption Analyser (HV-GSA)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Seller premise; Vehicles, Cummins Engine; Service Provider
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2) (PACOnly)
Custom Bid for Services - Hiring of an ambulance at IREL Chavara/mining site Similar Category Hiring of Air Ambulance Service (Long Term Services)
Facility Management Services - LumpSum Based - Industrial; O&M of Mechanical Work; Consumables to be provided by service provider (inclusive in contract cost)
EBM PAPST make Centrifugal Radial Fan - Model: R2E 085- AA01-05 - as per enclosed specifications.
Supply of 40NB Pneumatic actuated Butterfly valve with SS 304 EPDM Disc, Supply of 40NB Pneumatic actuated Butterfly valve with SS 304 PTFE Disc, Supply of 50NB Pneumatic actuated Butterfly valve with SS 304 EPDM Disc, Supply of 50NB Pneumatic actuated Butterfly valve with SS 304 PTFE Disc, Supply of 50NB Pneumatic actuated Diaphragm valve with Ebonite Rubber lined Disc, Supply of 50NB Manual Gate valve SS304L, Supply of 80NB Manual Gate valve SS304L, Supply of 50NB Manual Gear Operated Butterfly valve, Supply of 80NB Manual Gear Operated Butterfly valve, Supply of 100NB Manual Gear Operated Butterfly valve, Supply of 125NB Manual Gear Operated Butterfly valve, Supply of 150NB Manual Gear Operated Butterfly valve, Supply of 200NB Manual Gear Operated Butterfly valve, Supply of 250NB Manual Gear Operated Butterfly valve, Supply of 50NB Non Return Valve, Supply of 80NB Non Return Valve, Supply of 100NB Non Return Valve, Supply of 125NB Non Return Valve, Supply of 150NB Non Return Valve, Supply of 200NB Non Return Valve, Supply of 250NB Non Return Valve, Supply of 15NB Manual Gate valve, Supply of 25NB Manual Gate valve, Supply of 50NB Manual Gate valve, Supply of 80NB Manual Gate valve, Supply of 100NB Manual Gate valve, Supply of 150NB Manual Gate valve, Supply of 200NB Manual Gate valve, Supply of 250NB Manual Gate valve, Supply of 300NB Manual Gate valve
Valve Regulated Lead Acid (VRLA) Batteries as per TEC Specification (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Online Conductivity Measuring System Consists Of Range: 0 To 10µ S/cm, Online Conductivity Measuring System Consists Of Range: 0 To 100µ S/cm, Online Conductivity Measuring System Consists Of Range: 0 To 5µ S/cm
Fixed Computer Workstation (Q2)
Microwave Plasma Optical Emission Spectrometer
MULTICHANNEL AMPLIFIERS TYPE-1 FOR, AUDIO SYSTEM. SPECIFICATIONS GIVEN, IN THE ANNEXURE
Supply, Installation and commissioning of Xtralis VESDA - E VEP with LEDs, Model: VEP-A00-P, Model: VEP-A00-1P
Hot redundant plc based system
Hand Held Metal Detector as per MHA QR, Supply, safe delivery and warranty of CCTV Tester used for checking of both Analog and IP Cameras
Digital Storage Oscilloscope (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6971154 Dated : 15-12-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 40 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : The President of India (Acting through the Regional Director, Purchase and stores) Directorate of Purchase and Stores, Department of Atomic Energy, Madras Regional Purchase Unit, DAE Nodal Facility Centre, Dr. Rajendra Prasad Road, Pallavaram, Chennai- 600 043 (.)
Contaminationmonitor (Q3)
Office Suite Software (V3) (Q2) ( PAC Only ) (3 (3 ))
Antiwear Hydraulic Oil Heavy Duty (V4) asper IS10522 (Q2) (PACOnly)
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2) (PACOnly)
EDS detector for CrossBeam340 FESEM, 51N1307 as per specification
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Thermal Insulation of Piping and equipments; Service Provider
Moisture sensor for lube oil system of Main turbine
Safe supply delivery of Finder make relay comprise of coil voltage 48VDC with 4 set of Common, Norma
Lattice Boltzmann CFD Tool for Pollutant Simulations
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4) (3 (3 ))
Single Use Sterile Rubber Surgical Gloves Conformingto IS13422 (Q2)
Powder-Liquid Acid-Base Dental Cements Conformingto IS/ISO9917 (Part1) (Q3)
Scrubber Dryer Floor Cleaning Machine (V2) (Q3)
Custom Bid for Services - CMC FOR DENTAL CHAIR Similar Category Customized AMC/CMC for Pre-owned Products
Custom Bid for Services - CMC OF DENTAL CHAIR MODEL ADEC-500 Similar Category Customized AMC/CMC for Pre-owned Products
O Ring. Material - NBR, Hardness - 70 Shore- A. Size - ID: 36.4 to 37. Dia - 4.6 mm, Hardness - 70 Shore- A., Size - ID: 193.5 to 196.5, Dia - 4.6 mm
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 1 Shifting of Neutron Detector from Turbine Building to RCB; As per tender conditions, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 2 Removal of existing 12 cps neutron detectors from pile, shifting and storing at MAL area/Storage Pit area; As per tender conditions, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 3 Installation of new pointtwo cps neutron detectors on pile; As per tender conditions, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 4 Shifting of 6nos of removed 12 cps Neutron Detectors from MAL area/storage Pit Area, packing in transportation structure and taking out from RCB t..
High power RF circulator with termination