Loading…
Loading…
7,710 results • Latest
Transcriptomics of human PBMCs as per attached annexure
M/s. BTP Proces Control make Self priming centrifugal pump with mechanical seal, Model: - MSP-SP 80X8, M/s. BTP Proces Control make Mechanical Seal, Model-21T5GA
Supply Of Tungsten Carbide Inserts, Indian Standard (BIS-9897) CCMW 060202 As Per Specification, Supply Of Tungsten Carbide Inserts, Indian Standard (BIS-9897) KNUX 160405-L01 As Per Specification, Supply Of Tungsten Carbide Inserts, Indian Standard (BIS-9897) KNUX 160410-L02 As Per Specification, Supply Of Tungsten Carbide Inserts, Indian Standard (BIS-9897) VPGT 060202-45LM As Per Specification
SUPPLY OF NEW SYNTHETIC OIL AS PER SPECIFICATION ENCLOSED
10.1" HMI controller with detailed specifications as per the indent annexure.
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF BOOST CUM FLOAT BATTERY CHARGER.
Glove Box along with Gas Purification System
Pressure Calibrator of range 0- 3000 kPa as per the specification enclosed, Hand pump for Pressure Calibrator as per the specification enclosed, Accessories for Hand pump as per specification enclosed
Procurement of Bucket for Wheel loader BL-656
Custom bid for: Limit Switch: Make: Bharat Cuttler Hammer. Model-LLGS.
Supply, Installation and training of Ultra Low background Liquid Scintillation Counter(with guard)
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS15549 (Q3)
Household Laundry Detergent Powders (V2) Conformingto IS4955 (Q4)
COPPER GASKET (WASHER SIZE 160 MM OD, 151 MM ID, 1.5 MM THICK
NON POE LAYER 3 ACCESS SWITCH 24 PORTS
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Assistance in cobalt element replacement for details refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Coolant channel in-service inspection assistance in Fueling machine vault for details refer BOQ; As per Scope of work, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Assistance in BARCIS erection activity in Fueling machine vault for details refer BOQ; As per Scope of work, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Zig saw panels removal and installation, Installation is to be done as per satisfaction and checking b the FHU section for detail.., and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Assistance in Creep adjustment of coolant channels for details refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Assistance in Channel repositioning of coolant channel for details refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Assistance in Creep nut cutting for details refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Assistance for ICE box installation and removal on feeder for details refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Assistance for feeder bank support removal and re- installation for details refer BOQ; As per Scope of work, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Insulation panel removal and reinstallation for details refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Feeder to feeder and feeder to hardware gap measurement of feeder pairs for details refer BOQ; As per Scope of work, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Manual Creep measurement of coolant channels for details refer BOQ; As per Scope of work, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; PSS upper chamber replacement for details refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Adjuster Drive dismantling, & decontamination for details refer BOQ; As per Scope of work
Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Assistance in shifting for replacement of the BBD IX Refer BOQ; As per Scope of work, Repair, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Load testing of EOT cranes of more than (>30 MT capacity) Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Quarterly preventive maintenance of EOT cranes (>30 MT capacity) Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Annual preventive maintenance of EOT cranes of more than 30 MT capacity Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; LT/CT Gear Box overhauling Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Main Hoist Gear Box overhauling Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Load testing of EOT cranes (<30 MT capacity) Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Quarterly Maintenance of these cranes (<30 MT capacity) Refer BOQ; As per Scope of work, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Annual Maintenance of these cranes (<30 MT capacity) Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; LT/CT Gear Box overhauling (<30 MT capacity) Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Main Hoist Gear Box overhauling (<30 MT capacity) Refer BOQ; As per Scope of work, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Load testing of Electrical and manual hoists Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Quarterly Maintenance of electrical hoists Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Annual Maintenance of electrical hoists Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Gear box overhauling of these electrical hoists Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Annual maintenance of manual hoist Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Load testing of Slings Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Load testing of D-shackles/Eye-bolts Refer BOQ; As per Scope of, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Load testing of Chain pulley blocks/Huck- Chucks Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Load testing of load balancer/load cell/special tools/Turn- buckles Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Preventive maintenance of Chain pulley blocks/Huck- Chucks Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; CISF check post barrier repairing/gear box maintenance Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Hatch block removal in radiation areas Refer BOQ; As per Scope of work, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Maintenance of manual wheel trolley Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Periodic inspection and/or maintenance of chemical laboratory fume hoods Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Assistance in shifting of material inside radiological controlled area Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Assistance in shifting of material outside radiological controlled area Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Assistance of Forklift/EOT crane operation Refer BOQ; As per Scope of work, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Inspection of slings/D-shackles/eye bolts etc Refer BOQ; As per Scope of work, and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Supply and Replacement of GI Strip of thickness of 1 mm suitable for rolling shutter of length between 5 mtr to 7 mtr Refer BOQ; .., and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Supply and installation of complete set of manually operated Gear Box (including drive pipe, bevel gear set of top and bottom) su.., and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Supply and installation of one set (One set consists of two nos of spring) of special steel wire Spring (number-2)/(number-3) su.., and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Supply and installation of Air/Diesel/Transmission/Hydraulic Filter suitable for fork lift of 3 & 5 Ton capacity Refer BOQ; As pe.., and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Supply and installation of Hydraulic rubber hose (along with brake oil of 250 ml) with end fittings of capacity up to 200, and Installation of Plant Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Dismantling, Loading of goliath gantry crane (10 Ton) at RAPS-3 (RAB-3 SIDE) and Transportation of goliath gantry crane from RAPS.., and Installation of Plant/Systems/Equipments (Version 2) - Rawatbhata Rajasthan Site Unit-3 and 4; Refurbishment (including overhauling), installation and testing of goliath gantry crane (10 Ton) outside RB along with supply of ..
Stainless Steel Plate, Material: SS 316L, Size: 2mm ThickX1250mm To 2000mm WidthX2500mm To 4000mm Length ( 100 kilogram ), Stainless Steel Plate, Material: SS 316L, Size: 6mm ThickX1250mm To 2000mm WidthX2500mm To 6000mm Length ( 25 kilogram ), Stainless Steel Plate, Material: SS 316L, Size: 10mm ThickX1250mm To 2000mm WidthX2500mm To6000mm Length ( 10 kilogram ), Stainless Steel Plate, Material: SS 304, Size: 6mm ThickX1250mm To 2000mm WidthX2500mm To 6000mm Length ( 50 kilogram )
Operation And Maintenance Of Lifts (Elevators) - Monthly Comprehensive maintenance of Two nos elevator installed at NPCIL Noida Guest House Sec-62, complete in all respect including replacement of defective components, As per Annexure-1
INSULATED FUSE PULLING HANDLE FOR DIN TYPE HN FUSE-LINK FROM 63A-800A, VOLTAGE RATING: 1000V, INSULATED LONG HANDLE FUSE PULLER FOR DIN TYPE HN FUSE-LINK FROM 63A-800A, VOLTATGE RATING: 1000V, FUSE PULLING HANDLE FOR FERRULE TYPE HF FUSE-LINK FROM 2A-63A
Supply of Gland packing set of CV 6504, Supply of Body Gasket of CV 6504, Supply of Seat Gasket of CV 6504, Supply of seat ring of CV 6504, Supply of seal ring of CV 6504, Supply of Yoke gasket of CV 6504, Supply of actuator diaphragm of CV 6504, Supply of flat spring of CV 6504, Supply of Coupling assembly along with accessary of CV 6504, Supply of Gland packing set of CV 6501, Supply of Body gasket of CV 6501, Supply of seat gasket of CV 6501, Supply of Plug steam assembly of CV 6501, Supply of seat ring of CV 6501, Supply of TEC Seal Ring of CV 6501, Supply of Cage of CV 6501, Supply of Yoke Gasket of CV 6501, Supply of Actuator Diaphragm of CV 6501, Supply of Flat Spring of CV 6501, Supply of Coupling assembly along with accessary of CV 6501, Supply of Gland packing set of CV 6502, Supply of Body gasket of CV 6502, Supply of Seat Gasket of CV 6502, Supply of Seat ring of CV 6502, Supply of Seal Ring of CV 6502, Supply of Actuator Diaphragm of CV 6502, Supply of Flat spring of CV 6502, Supply of Coupling assembly along with accessary of CV 6502, Supply of Gland Packing set of 4113 CV 6501, Supply of Body Gasket of 4113 CV 6501, Supply of Seat gasket of 4113 CV 6501, Supply of Plug steam assembly of 4113 CV 6501, Supply of Seat Ring of 4113 CV 6501, Supply of TEC Seal ring of 4113 CV 6501, Supply of Cage of 4113 CV 6501, Supply of Yoke Gasket of 4113 CV 6501, Supply of Actuator packing of 4113 CV 6501, Supply of Actuator Diaphragm of 4113 CV 6501, Supply of Coupling assembly along with accessary of 4113 CV 6501, Supply of Gland packing set of 4113 CV 6502, Supply of Body Gasket of 4113 CV 6502, Supply of Seat gasket of 4113 CV 6502, Supply of Plug steam assembly of 4113 CV 6502, Supply of Seat ring of 4113 CV 6502, Supply of TEC Seal ring of 4113 CV 6502, Supply of Cage of 4113 CV 6502, Supply of Yoke gasket of 4113 CV 6502, Supply of Actuator Diaphragm of 4113 CV 6502, Supply of Coupling assembly along with accessary of 4113 CV 6502, Supply of Gland packing set of 4113 CV 6503, Supply of Body Gasket of 4113 CV 6503, Supply of Seat gasket of 4113 CV 6503, Supply of Plug stem assembly of 4113 CV 6503, Supply of seat ring of 4113 CV 6503, Supply of Yoke gasket of 4113 CV 6503, Supply of Actuator Packing of 4113 CV 6503, Supply of Actuator Diaphragm of 4113 CV 6503, Supply of Coupling assembly along with accessary of 4113 CV 6503, Supply of Gland packing set of 4113 CV 6504, Supply of Body Gasket of 4113 CV 6504, Supply of Seat gasket of 4113 CV 6504, Supply of Plug stem assembly of 4113 CV 6504, Supply of Seat ring of 4113 CV 6504, Supply of TEC Seal ring of 4113 CV 6504, Supply of CAGE of 4113 CV 6504, Supply of Yoke gasket of 4113 CV 6504, Supply of Actuator Diaphragm of 4113 CV 6504, Supply of Coupling assembly along with accessary of 4113 CV 6504, Supply of Gland packing set of 3611 AV 6501, Supply of Body gasket of 3611 AV 6501, Supply of Seat gasket of 3611 AV 6501, Supply of Plug stem assembly of 3611 AV 6501, Supply of seat ring of 3611 AV 6501, Supply of TEC Seal ring of 3611 AV 6501, Supply of CAGE of 3611 AV 6501, Supply of Yoke gasket of 3611AV 6501, Supply of Actuator packing of 3611 AV 6501, Supply of Actuator Diaphragm of 3611 AV 6501, Supply of Flat spring of 3611 AV 6501, Supply of Coupling assembly along with accessary of 3611 AV 6501, Supply of coupling set along with key and screw of 3612 CV 1226, Supply of Gland packing set of 3612 CV 1226, Supply of Body gasket of 3612 CV 1226, Supply of seat gasket of 3612 CV 1226
Compostable Bio-Medical Waste Collection Bags (Biohazard Bags) (V3) (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; HVAC; Service Provider
Forklifts (V2) asper IS6765: 2003and IS10517 (Q2)
Glass Electrode for Corona HTRS as per technical specification
Vacuum Compactible Rotation and Translation unit for Growth Station assembly
Metal Polish, Liquid (V2) Conforming to IS 5487 (Q3), Unsintered PTFE Teflon tape for Thread Sealing Applications Conforming to IS 14643 (V2) (Q3), Blotting paper (Q3), HT Tape (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Toner Cartridges/Ink Cartridges/Consumablesfor Printers (Q2) (PACOnly)
Antifriction Split Cylindrical Roller Bearing (locating type) of Bore 80mm, Antifriction Split Cylindrical Roller Bearing (locating type) of Bore 115mm, Antifriction Split Cylindrical Roller Bearing (non locating type) of Bore 80mm
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; HVAC; Service Provider
Raw edge cogged belts SPBX-2840 Aramid cord
Customized AMC/CMC for Pre-owned Products - SIMS; CAMECA; Annual Maintenance Contract (AMC); Annually; Yes
Mass Spectrometer based Helium Leak Detector (MSLD) with Accessories and Spares
Entry and Mid Level Desktop Computer (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
LPIS Solenoid Valve 15-NB, Make: Rotex Automation Limited
Reverse Delay Timer and other spares for PSS drive Test
SERIES III MIL GRADE CIRCULAR CONNECTORS AND BACK
Supply Installation and Commissioning of DSP based Auto
Full Service and Maintenance Contracts of Photocopier Machine - Multifunctional Digital Color Copier Machine; Versalink C 7130; OEM Authorised Service Provider; Paper to be provider by Buyer; Tonner/Cartridge to be provider by Service Provider.; Not ..
Pest and Animal Control Service - Maintenance Contract; 1 month; General Pests/Insects Control
Convective Patient Warming System (Q2)