Loading…
Loading…
7,491 results • Latest
Rotary Knob Dia 31mm as per Sl No 1 in Annexure A, Rotary Knob Cover as per Sl No 2 in Annexure A, Rotary Transducer as per Sl No 3 in Annexure A, Combined Liner Carbon as per Sl No 4 in Annexure A, Contact Tip for EWM as per Sl No 5 in Annexure A, Gas Diffuser as per Sl No 6 in Annexure A, Collet chuck for EWM as per Sl No 7 in Annexure A, O-Ring EWM as per Sl No 8 in Annexure A, Solenoid Valve for TIG as per Sl No 9 in Annexure A, Tungsten Electrode as per Sl No 10 in Annexure A, Tungsten Electrode as per Sl No 11 in Annexure A, Gas diffuser as per Sl No 12 in Annexure A, Blue Cool Coolant as per Sl No 13 in Annexure A
Drinking Water Pump 50-15L-7, Drinking Water Pump 65- 19E7
Multifunction Printer (Print, Scan, Copy) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7136935 Dated : 28-01-2026 Bid Document 1/13 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Multifunction Printer (Print, Scan, Copy) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Operation And Maintenance Of Other Machines And Plants - Any
Testing Service for On-Board/Commissioned Equipment Instrument related to Plant - NDT; Eddy Current Testing facility, Leak Testing Facility, Magnetic Particle Testing, Penetrant Testing Facility, Radiography Testing Facility, Ultrasonic Testing Fac..