Loading…
Loading…
2,422 results • Recent activity
Dark Fiber Lease Service - Point to Point Based - Dry Lease; Single Mode; Intracity; 1; Aerial, Underground; NA; NA
Custom Bid for Services - Supply erection testing and commissioning of Pumping arrangement for HVW system and hydrant system complete with all piping valves fittings etc inside pump house for Fire Protection System with dismantling of existing old P.. Similar Category Operation And Maintenance Of Fire Fighting System
Dark Fiber Lease Service - Point to Point Based - Dry Lease; Single Mode; Intracity; 1; Aerial; NA; NA
Single/Double Wooden Bed with/without Storage (V2) (Q2), Modular Table/Meeting Table/Centre Table (V2) (Q2), Foam Mattress (V3) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6727581 Dated : 10-10-2025 Bid Document 1/10 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Single Packet Bid Primary product category Single/Double Wooden Bed with/without Storage (V2) Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 408987.35 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Supply Of CSD at Jhatikara SS, NR-I, Supply Of CSD at Bhiwani SS, NR-I, Supply Of CSD at Dwarka SS, NR-I, Supply Of CSD at Meerut SS, NR-I, Supply Of CSD at Saharanpur SS, NR-I, Supply Of CSD at Baghpat SS, NR-I, Supply Of CSD at Kurukshetra SS, NR-I, Installation and Commissioning at Jhatikara SS, NR-I, Installation and Commissioning at Bhiwani SS, NR-I, Installation and Commissioning at Dwarka SS, NR-I, Installation and Commissioning at Meerut SS, NR-I, Installation and Commissioning at Saharanpur SS, NR-I, Installation and Commissioning at Baghpat SS, NR-I
Composite Long Rod Insulators (POWERGRID) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6957111 Dated : 05-12-2025 Bid Document 1/12, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Composite Long Rod Insulators (POWERGRID) Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 346000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 20 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/12 Beneficiary : POWERGRID Power Grid Corporation of India Limited Central Procurement Cell, Plot No. – 2A/INS 02, Avadh Vihar Yojna, Amar Shaheed Path, Near Medanta Hospital Lucknow- 226002 (UP) (Power Grid Corporation Of India Limited)