Loading…
Loading…
3,577 results • Latest
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - MUV; Mahindra Bolero Camper, Isuzu Dmax; 2025 or later; 0-25, 000 kms; A/C; 24 X 7 365 days
Dark Fiber Lease Service - Point to Point Based - Dry Lease; Single Mode; Intracity; 1; Aerial, Underground; NA; NA
Manpower Outsourcing Services - Minimum wage - Skilled; As per ATC of the GEM Bid document; Others, Manpower Outsourcing Services - Minimum wage - Semi-skilled; As per ATC of the GEM Bid document; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; As per ATC of the GEM Bid document; Others
Rotational Moulded Polyethylene Water Storage Tanks (V3) Conforming to IS 12701 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Dark Fiber Lease Service - Point to Point Based - Dry Lease; Single Mode; Intracity; 1; Underground, Aerial; NA; NA
Custom Bid for Services - undefined Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Operation and Maintenance Of Electrical Systems/Electrical Installations
Manpower Outsourcing Services - Minimum wage - Highly- Skilled; High School; Admin, Manpower Outsourcing Services - Minimum wage - Skilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Semi- skilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Extension of hydrant point to Store area and bypass of hydrant pipeline during test/idle run of Hydr
Gift Vouchers Service
Single/Double Wooden Bed with/without Storage (V2) (Q2) ( PAC Only ), Wooden Shelf/Case/Rack/Credenza Modular Storage (V2) (Q2) ( PAC Only ), Modular Table Meeting Table/Centre Table (V2) (Q2) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7046154 Dated : 21-01-2026 Bid Document 1/14, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Single/Double Wooden Bed with/without Storage (V2) Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 121034 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Manpower Outsourcing Services - Minimum wage - Highly- Skilled; High School; Others, Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others, Manpower Outsourcing Services - Minimum wage - Semi- skilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others, Manpower Outsourcing Services - Man-days based - Skilled Manpower for Electrical AMC; Skilled; Skilled Manpower for Electrical AMC, Manpower Outsourcing Services - Man-days based - Semi-Skilled Manpower for Electrical AMC; Semi- skilled; Semi-Skilled Manpower for Electrical AMC
LG Domestic Microwave Oven Capacity / Volume (Litres) 28
AFO Automatic Fire Ball for Fire-Extinguishing of Medium size - the, AFO Automatic Fire Ball for Fire-Extinguishing of Medium size - the weight of the agent is not less than 1.0 kg but less than 1.8 kg
EXIDE 12 Volt 7 Ah Stationary Valve Regulated Lead Acid Battery
Protection of tower Through Backfilling, Revetment wall and /or Gabion Wall-PKG-I
Protection of tower Through Backfilling, Revetment wall and /or Gabion Wall.-PKG-II
Supply of 420KV Circuit Breaker with CR, Supply of 420KV Circuit Breaker Without CR, Supply of 245kV Circuit Breaker, Supply of CONTROLLED SWITCHING DEVICE, Supply of 145kV Circuit Breaker, F and I for 420KV Circuit Breaker With CR, F and I for 420KV Circuit Breaker Without CR, F and I for 245kV Circuit Breaker, F and I for CONTROLLED SWITCHING DEVICE, F and I for 145kV Circuit Breaker, Supervision of Erection Testing and comissioning of 400kV Circuit Breaker Without CR, Supervision of Erection Testing and comissioning of 400kV Circuit Breaker With CR, Supervision of Erection Testing and comissioning of 220kV Circuit Breaker, Supervision of Erection Testing and comissioning of CONTROLLED SWITCHING DEVICE, Supervision of Erection Testing and comissioning of 132kV Circuit Breaker
Supply of 420KV Circuit Breaker Without CR, Supply of 420KV Circuit Breaker With CR, Supply of 245kV Circuit Breaker, Supply of CONTROLLED SWITCHING DEVICE, Supply of 145kV Circuit Breaker, F and I for 420KV Circuit Breaker Without CR, F and I for 420KV Circuit Breaker With CR, F and I for 245kV Circuit Breaker, F and I for CONTROLLED SWITCHING DEVICE, F and I for 145kV Circuit Breaker, Supervision of Erection Testing and comissioning of 400kV Circuit Breaker Without CR, Supervision of Erection Testing and comissioning of 400kV Circuit Breaker With CR, Supervision of Erection Testing and comissioning of 220kV Circuit Breaker, Supervision of Erection Testing and comissioning of 132kV Circuit Breaker, Supervision of Erection Testing and comissioning of CONTROLLED SWITCHING DEVICE
Manpower Outsourcing Services - Minimum wage - Skilled; As per ATC of GEM Bid document; Others, Manpower Outsourcing Services - Minimum wage - Semi-skilled; As per ATC of GEM Bid document; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; As per ATC of GEM Bid document; Others
Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; 2025; 0-25, 000 kms; A/C; 8
Professional Painting Service - As per bid documents; As per bid documents; As per bid documents
Insulating Oil For Transformer As Per POWERGRID TS (Q3)
Supply, Delivery & Installation Biometric Access Control System (ACS) at 765/400/220 kV Kurnool-3 PS
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio, Mahindra Bolero, or equivalent or Higher model; 2025; 0-25, 000 kms; A/C; 12
Reverse Osmosis based Point of Use Water Treatment System for Drinking Purposes (V3) as per IS 16240 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Stationary Storage Type Electric Water Heaters (Geyser) (V3) ISI Marked to IS 2082 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Facility Management Service- Manpower based (Version 2) - Industrial; Housekeeping; Skilled, Facility Management Service- Manpower based (Version 2) - Industrial; Housekeeping; Semi-skilled, Facility Management Service- Manpower based (Version 2) - Industrial; Housekeeping; Unskilled
Supply of VEP A00 1P model VESDA detector Model No VEP A00 1P make Xtralis, Supply of VESDA display unit Model No VSR 2222 4 Display is one Set make Xtralis, Supply of 220VDC 24V DC MPS unit Model No LI120 20B24R2S, Supply of filter Model No VSP 962 make Xtralis, Supply of VESDA HLI VHX 1200 Model No VHX 1200 make Xtralis
Manpower Outsourcing Services - Minimum wage - Semi- skilled; Not Required; Non-IT Technical
Stationary Valve Regulated Lead Acid Batteries (V2) as per IS 15549 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6721937 Dated : 24-09-2025 Bid Document 1/7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 20000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 27 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : POWER GRID Corporation OF INDIA Limited POWERGRID CORPORATION OF INDIA LIMITED, Eastern Region-I Headquarter (ER-I RHQ), Board Colony, Near Transformer Repair Works, Shastri Nagar, Patna, Bihar 800023, PATNA, BIHAR-800023, India (Eastern Region) (Eastern Region) (Eastern Region)
Hiring of Agency for IT Projects- Milestone basis
Heavy Duty Storage Racks (Q3) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7030786 Dated : 18-01-2026 Bid Document 1/8 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Single Packet Bid Primary product category Heavy Duty Storage Racks Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Dark Fiber Lease Service - Point to Point Based - Dry Lease; Single Mode; Intracity; 1; Aerial; NA; NA
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; MAHINDRA BOLERO OR EQUIVALENT VEHICLE; BRAND NEW; BRAND NEW; A/C; 8
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Maruti Suzuki Ertiga; 2025; 0-25, 000 kms; A/C; As per ATC
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; 2025; 0-25, 000 kms; A/C; 24*7
Hiring dark fiber on lease from third party for protection of ONGC Guwahati and for renewal of links in Imphal
Supply of Inhibited Insulating Oil at various substations of Northern Region-I Grp-I and Grp-II of POWERGRID Specification No. NCN0218
WC-4385-G-Route alignment and Detail survey activities for 765kV DC Kurnool-V to Sagar TL Line length 240 Kms plus 400kV DC Sagar to Nagarjunasagar TL Line length 25 Kms Total line length 265 Kms
Circuit Breaker Package CB-04-Bulk procurement (LOT-3) for Substation Equipments for implementation of Bay
Circuit Breaker Package CB-03 Bulk procurement LOT-3 for Substation Equipments for implementation of Bay.
Transmission Line Package - TL01 for (a) Diversion of 400kV Sundergarh-Raigarh D/C line Ckt. 2and4; (b) Diversion of 400kV Sundergarh-Raigarh D/C line Ckt. 1and3; and (c) Diversion of 220kV Budhipadar-Korba S/C Line Ckt3 under Consultancy Services to M/s Vendanta Limited
fingers Wireless Handheld Microphone With Supercardioid, fingers Wireless Handheld Microphone With Supercardioid Polar Pattern
Monthly Basis Cab & Taxi Hiring Services - MUV; 2000 km x 320 hours; Outstation 24*7
Inverter (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6943117 Dated : 08-01-2026 Bid Document 1/7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 28 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SR DGM POWERGRID Corporation OF INDIA Limited, Western Region Transmission System-II, Regional Head Quarter, Plot54, Adjacent to Riya-Revati Resort, Sama-Savli Road, Vadodara - 390024, Gujarat (Sr Dgm, Contracts And Material Dept)
Induscoat Ready Mixed Paint 20 liter (Steel drum as per IS 2552)
Tacitine NGFW With 3 Years On Site OEM Warranty
Unbranded Without Standing Hand Fiber 25 Inch