Loading…
Loading…
8 results • Latest
Complete Overhaul, Upgradation, and Modernization of the Existing Underground Tunnel Illumination System in the Right Bank Tunnel of BHEP Stage-II by Way of Providing, Installing, Testing, and Commissioning Energy-Efficient Overhead LED Luminaires wi
Supply, Laying, and Installation of Industrial-Grade Interlocking Flooring System (Puzzle-Type 5 mm Thick PVC Tiles) on Turbine/Generator Floor of Power House.
Refurbishment and Upgradation of Pantry at Machine Hall (EL 708.30) and Control Room (EL 713.00) of Power House Stage-II
Replacement of Damaged and Worn-Out Sanitary Installations and Supply, Installation and New Fixtures in Bathrooms of Power House Stage II
Provision for Providing and Laying Vitrified Floor Tiles of Approved Make and Specification in Offices and Other Allied Areas of Power House Stage-II
Painting and Emulsion Work for Pot Head Yard of Power House Stage-II and Allied Areas, Clearing of Vegetation, and Installation of Chequered Plates for Covering Drains