Loading…
Loading…
5,628 results • Latest
Construction of Community Sanitary Complexes at MJPAPBCWR School Girls of Kalikiri ho Kalikiri GP of Kalikiri Mandal
Providing drinking water facilities to BC Colony (Gollapeta) in Chinakada Village of Chinakada GP in Dattirajeru Mandal
Construction of Health and Wellness Center Building at Tsodyapalem (V) of Repalle (M) Est Cost Rs 36.00 Lakhs
Construction of Health and Wellness Center Building at Kishkindapalem (V) of Kolluru (M) Est Cost Rs 36.00 Lakhs
Construction of Health and Wellness Center Building at Potharlanka (V) of Kolluru (M) Est Cost Rs 36.00 Lakhs
Providing BT road from Kunkalagunta of Nekarikallu Mandal to Karlakunta of Rompicherla (M) in Sattenapalli Constituency, Estimate Cost Rs.550.00 lakhs
Development works to Existing Community Building Near Sai Baba Temple Sainagar Valmikipuram GP in Valmikipuram Mandal
Construction of Slab Culvert Across Goguthippa Irrigation Canal Near Saagiraju Somaraju Site at Goguthippa H/o Malavanithippa Village of Kalla Mandal
Construction of Bridge Across Irrigation Canal Near Burriel Ground at L N Puram Village of Kalla Mandal
Construction of CC Drain from D.No.48/241 to D.No.48/276 at Vilasambavi back side, in Ravindra Nagar, Division No.42.
Re-Construction of Sri Vinayaka Temple at Naniyala (V), Ramakuppam (M), Chittoor District
Laying of CC Road and 300MM CC Drain from D.No. 50/223-14 to 50/224-8A, 450MM CC Drain from D.No. 50/224-14 to 50/210-3, 49/61 (Back Side) to 46/56-4-4 towaqrds buggavanka in Ravindra Nagar 41st Division of Kadapa Municipal Corporation
Re-Construction of Sri Ramalayam at Vasanadu Gollapalli(V), Kuppam(M), Chittoor District
Improvements to Nellore- Mulumudi -Tatiparthi Road ( SH 353 ) from KM 20/6 to 27/6 ( in Bits ) in SPSR Nellore District.
Re-Construction of to Sri Hanumantharaya Swamy Temple at H.Kottalu(V), Kuppam (M), Chittoor District.
Construction of Toilets & Bathrooms to GTWAHS Boys at Kothavalasa Village in Ananthagiri Mandal of Alluri Sitharamaraju District
Re-Construction of Sri Thimmaraya Swamy Temple at Lingapuram (V), Ramakuppam (M), Chittoor District
Balance Works of Sri Ramanjaneya Swamy Temple at Govindapalli S.C. Colony(V), Ramakuppam (M), Chittoor District.
Re-Construction of Sri Ramalayam at S.Gollapalli (V), Ramakuppam (M), Chittoor District.
Improvements to Sri Changalapattu Mariyamma Devatha Temple at ChikkapalliThanda(V), Ramakuppam (M), Chittoor Dist.
Re-Construction of Sri Gokula Sri Krishna Devalayam GutturuThanda (V), Ramakuppam (M), Chittoor
Re-Construction of Sri Thimmaraya Swamy Sridevi Bhudevi Temple at Bellakogila (V), Santhipuram (M), Chittoor District.
Breakdown & Repair works for 2026-27-AMC- Arresting of holes, cracks and internal metal fillings for eroded portions on cooling water lines, ACWP lines, PHE's spools and duplex strainers etc., for day to day welding maintenance works and Unit-1&2 overhaul works by cutting, welding and grinding works pertaining to Sub Division-I of CAM division as and when required during the year 2026-27 for the period from 01-4-2026 to 31-03-2027
Construction of Class Rooms (2 Nos) to APTWRS(Girls),Arakuvalley Village and Mandal of Alluri Sitha Ramaraju District.
Re-Construction of Sri Veeranjaneya Swamy Temple at Kamathamuru Road Sekhar Nagar (V) Kuppam Municipality, Chittoor District.
Supply of cotton, Heat Resistant and Leather Hand Gloves
Re-Construction of Sri Gangamma Temple at Kanamanapalli (V), Gudupalli (M), Chittoor District.
Conducting Training Programme on Employability Skills at Sri Padmavati Mahila Visvavidyalayam, Tirupati.
Re-Construction of Sri Uri Gangamma Temple at Paramasamudram(V), Kuppam Municipality, Chittoor District.
Balance Works of Srl Gangamma Temple at Kadepalli (V}, Gudupallt (M), Chittoor Distdct.
Providing chain link fencing to the alround boundary (three sides) of S.V. Gosamrakshanasala at Kamalaihgari palli, near Bhakarapeta, Chittoor District
Providing security guards at the vehicles yard, yetimoga for a period of one year, from 1st april 2026 to 31st march 2027 in kakinada municipal corporation.
Balance Works of Srl Gangamma Devatha Temple at Bagalanatham (V), Ramakuppam (M), Chittoor District.
Construction of 600 mm drain and CC berms from temple arch to bus shelter Arasavalli velama veedhi secretariat, Division No.7 in Srikakulam Municipal Corporation
Providing security guards at the vehicle yard, bondagunta for a period of one year, from 1st april 2026 to 31st march 2027 in kakinada municipal corporation.
Re-Construction of Sri Prasanna Muthu Maremma Temple at Munaswamipuram(V), Kuppam Municipality, Chittoor District.
Re-Construction of Sri Subramanya Swamy Temple at Nallapareddivuru (V), Santhipuram (M), Chittoor District.
Re-Construction of Sri Ubbu, Devara Temple Dhobi Ghat, Kuppam Municipality, Chittoor District.
Re-Construction of Sri Gangamma Temple at Dhiguvakimadugu(V), Kuppam (M), Chittoor District
Laying of parking tiles in A2 quarters ramp to prevent rain water stagnation in RGUKT RK Valley
Construction of CC Drains from a. D.No.53/168 to D.No.53/158-3, in Welfare Colony. b. D.No.51/11-2 to D.No.51/6, in Ravindra Nagar in Division No.42.
Re-Construction of Sri Thimmaraya Swamy Temple at 64 Pedduru (v), Santhipuram (M), Chittoor District.
O&M of CPWS Scheme to Pathapatnam and Other Habitations for the Year 2026-27 (Excluding Power Charges)
Laying of 400mm dia. D.I K9 Clear Water Pumping Main from Srinivasa Nagar Pump House to Rythubazar in ward No 11 under 15th FC 2024-25 1st Instll. Untied Grant
Laying of 160mm & 110mm dia HDPE Distribution Pipe line from D.No.21/452-Z-23-1-A-5A to D.No.21/452-Z-23-B-2, D.No.21/452-Z-23-B-2 to D.No. 21/452-Z-23-B-6, D.No. 21/452-Z-23-1A-11 to D.No.21/452-Z-23-1A-9-1 in Farooq Nagar Ward No. 07 under 15th FC 2024-25 1st Instll. Untied Grant
Providing internal painting DAV school at SDSTPS Township.
Providing Paintings to Dividers from Nehrubomma centre to Chittinagar junction, Circle-1 area(1st call)
The e tender for engaging of 1 No Closed vehicle 4 plus 1 Seater Diesel Petrol Hybrid CNG Bio Fuel EV or any type preference to be given to EV on Monthly hired basis for the use of Deputy Executive Engineer CT Meters1 Visakhapatnam in MRT Division APEPDCL Visakhapatnam The vehicle is under the control of the Executive Engineer MRT Visakhapatnam with a model of 2019 and above for a Period of 12 months from 01 04 2026 to 31 03 2027
Re-Construction of Sri Mariyamma Temple K.D.Palli(V), Kuppam (M), Chittoor District.
Re-Construction of Sri Rama Mandiram at C.Bandapalli (V), Santhipuram (M), Chittoor District.