Loading…
Loading…
39 results • Recent activity
Forming Bypass Road to Thiruvallur Town Km 3/7 - 6/6 Phase I
Sub Work for Supply and installation of Road Restraint System (Roller Barrier) on the Up Ramps for the Main work of Construction of Elevated Highway along Avinashi Road in Coimbatore City from Goldwins to Upplipalayam Km. 147/100 -157/200 of SHU-52.
Sub Work for Supply and installation of Road Restraint System (Roller Barrier) on the Down Ramps for the Main work of Construction of Elevated Highway along Avinashi Road in Coimbatore City from Goldwins to Upplipalayam Km. 147/100 -157/200 of (SHU-
Sub Work for Provision for decorative LED illumination to the landscaping work in the pier protection zone from P152 TO AP2 for the Main work of Construction of Elevated Highway along Avinashi Road in Coimbatore City from Goldwins to Upplipalayam Km
Sub Work for Provision for decorative LED illumination to the landscaping work in the pier protection zone from AP1 TO P152 for the Main work of Construction of Elevated Highway along Avinashi Road in Coimbatore City from Goldwins to Upplipalayam Km.
Balance works of Reconstruction of High Level Bridge at km 0/4 of Ayyampettai Ganapathyagraharam road (O 658) across of river Kudamuruti (Branch of River Cauvery)