FAULT RECTIFICATION OF GT2 GENERATOR BY REPLACEMENT OF 02 ADJACENT BOTTOM BARS INCLUDING REMOVAL REFITTING OF FULL PITCH TOP BARS AND ASSEMBLY OF GENERATOR AT NTPC FARIDABAD
DISMANTLEMENT OF HP TURBINE IP TURBINE REMOVAL OF USABLE CAPITAL SPARES AFTER VISUAL INSPECTION RLA WORKS OF PHASED OUT OF 210 MW UNIT5 PTPS PANIPAT
GENERATOR OVERHAULING AND STATOR FOUNDATION STUD REPLACEMENT AT UNIT 1 210MW NTPC SINGRAULI
REHEATER REPLACEMENT (INCLUDING ITS TESTING AND COMMISSIONING) AND CAPITAL OVERHAULING OF BOILER FOR TWO NUMBERS UNITS OF 210 MW AT GGSSTP RUPNAGAR
GENERATOR ROTOR THREADING OUT AND FAULT IDENTIFICATION IN 144.60 MW AIR COOLED GAS TURBINE-2 GENERATOR AT NTPC FARIDABAD
ADDITIONAL WORK OF HP TURBINE REPLACEMENT OF CRH PIPELINE AND OTHER ASSOCIATED WORKS IN 700 MW RAPP-7 UNIT AT NPCIL RAWATBHATA (RAJ)