Loading…
Loading…
8 results • Recent activity
Engineering, Design, Drawing, Supply, Erection, Testing and Commissioning of 25 kV, 50 Hz Single Phase Retractable Rigid Catenary System (RRCS) connecting with existing conventional regulated OHE at either end of Silo No -5 and 6 (Double Track in eac
Construction of Academic Block, Hostel Cluster consisting of 4 Blocks, and its associated services under EPC mode-III of Contract under phase-II at IIM Raipur
Engineering, Design, Drawing, Supply, Erection, Testing and Commissioning of 25 kV, 50 Hz Single Phase Retractable Rigid Catenary System (RRCS) connecting with existing conventional regulated OHE at either end of Silo No 1 and Silo No 2 (Double Track
Design, Drawing, Engineering, Supply, Erection, Testing and Commissioning of 25 KV, 50 Hz Single Phase Retractable Rigid Catenary System (RRCS), Rigid Overhead Conductor System(ROCS), connecting conventional regulated existing OHE at either end of Si
Construction of new Railway siding with proposed feeder line of East Rail Corridor at Pelma, Raigarh area of SECL taking off from Bhalumuda _Pelma section under SECR Ch _ 1527m (28481.542m F GGDA) to Ch 1156.91m (31165.452m F GGDA) (about 2.7 Km)
Construction of two numbers of ROBs Br No 99A TM at Ch43/680 Km, Br No100A TM at Ch45/780 Km of KRLTM section of NTPC Lara MGR In bulb portion Raikera