Loading…
Loading…
19,541 results • Latest
PLEASE REFER TO BOQ
Arrangement of Temporary Toilets. latrines, urinals, drinking water facilities for the pilgrims of Shrabani Mela-2026 at Singur Block at chandanagar Sub-Division under Hooghly Division, P.H.E. Dte., Cluster-04
Arrangement of Temporary Toilets. latrines, urinals, drinking water facilities for the pilgrims of Shrabani Mela-2026 at Singur Block at chandanagar Sub-Division under Hooghly Division, P.H.E. Dte., Cluster-03
Arrangement of Temporary Toilets. latrines, urinals, drinking water facilities for the pilgrims of Shrabani Mela-2026 at Singur Block at chandanagar Sub-Division under Hooghly Division, P.H.E. Dte., Cluster-02
Annual maintenance work for water supply Scheme Siwani Town
Arrangement of Temporary Toilets. latrines, urinals, drinking water facilities for the pilgrims of Shrabani Mela-2026 at Singur Block at chandanagar Sub-Division under Hooghly Division, P.H.E. Dte., Cluster-01
PLEASE REFER TO BOQ
PLEASE REFER TO BOQ
PLEASE REFER TO BOQ
Operation and guarding of Pumping machinery and others for Labpur Zone - I W/S Scheme (P/H no - II), under Labpur block.
Regular maintenance and cleaning of rooms, bathrooms, toilets, drains etc. of Purulia Sadar Sub-Division office of PHE Dte. (For the period of 01.09.2026 to 31.08.2027
PLEASE REFER TO BOQ
Construction of RCC SandS Tank, HLT, Sump well at water works and repair of existing structures
Providing Independent water works, Providing and laying of Distribution system in village
Operation and guarding of Pumping machinery and others for Lavpur Zone-II W/S Scheme (Centrifugal Pump only), under Labpur block.
Annual Rate Contract for providing Household Service Connections Div Sangod of UWSS
Daily Operation Mtc. of distribution system at Zone-V Panradda W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte For the period of 01.09.2026 to 31.08.2027
AS PER BOQ
Daily Operation Mtc. of distribution system at Zone-IV Panradda W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte For the period of 01.09.2026 to 31.08.2027
AS PER BOQ
Daily Operation Mtc. of distribution system at Zone-I Panradda W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte For the period of 01.09.2026 to 31.08.2027
AS PER BOQ
Operation and Maintanance Work for the Paschim Madati P.W.S.S at Phansidewa Block under Siliguri Division P.H.E.Dte. for the Period of 365 Days
Daily Operation mtc.of all rising main and entire distribution system Sluice Valve, Street Stand Post etc. under Arsha Its Adjoining Area W/S Scheme Zone-I under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2024 to 31.08.2025
DNIT for drilling and installation of shallow T/well and 01 No. Submersible tubewell at Krishna Colony (ward no. 17) Palwal complete in all respect and all other works contingent thereto.
AS PER BOQ
AS PER BOQ
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. for Ramnagar W/S Scheme of Purulia Sadar Sub-Division, Under Purulia Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
AS PER BOQ
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in SANGRAMPUR water supply scheme
Restoration Re-construction of Different water supply of Pouni, Bhomag, Reasi and Arnas Block in Sub Division Reasi under SASCI.
Restoration Re-construction of Different water supply of Pouni, Bhomag, Reasi and Arnas Block in Sub Division Reasi under SASCI.
Day-to-day operation and maintenance of 350 Cum capacity OHR and distribution system of Zone - II of surface water based water supply scheme for Manbazar - II Block (Part) under Purulia Sadar Sub-Division, PHE Dte. For the period of 01.09.2026 to 3
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in GOBINDAPUR water supply scheme
Operation and guarding of Pumping machinery and others for Labpur Zone - I W/S Scheme(High Lift and Low Lift), under Labpur block.
Preparation of Detailed Project Reports for Piped Water Supply Scheme under Jal Jeevan Mission to supply drinking water through Functional Household Tap Connections of various villages of Block Datia, Bhander and Seondha Distt. Datia
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in BANGLANI water supply scheme
Laying of 100 mm id D. pipe line at various sites in Ambala City
Daily Operation mtc.of all rising main and entire distribution system Sluice Valve, Street Stand Post etc. under Khudagara W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in ARSULA water supply scheme
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Manbazar W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in ITINDA PANITOR water supply scheme
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Puncha W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Daily Operation mtc. of rising main distribution system, sluice valve, street stand post etc. under Lagda W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in BARO BANKRA water supply scheme
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in GOTRA water supply scheme
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in JAFARPUR water supply scheme
Operation and guarding of Pumping machinery and others for Srichandrapur PWSS (P/H no - II)under Illambazar block
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in PASCHIM MADHYAMPUR water supply scheme
Operation and guarding of Pumping machinery and others for Matikona PWSS (P/H no - II)under Illambazar block