Loading…
Loading…
19,555 results • Latest
o and m baidyapur z-ii
Estimate for Upgradation Works including Odor Control System, Solar Power Plant, Online Water Quality Monitoring System, CCTV Surveillance, and Flow Meter at 10 MLD STP, Alapur, PHED Division No. 3 Palwal under Jal Hi Amrit Initiative of AMRUT 2.0
o and m baidyapur z-i
Installing of 1 no. shallow tubewell at village Jhanj Kalan
o and m simlan zii
o and m simlan z-1
o and m hatkalna
Urgency miscellinous balance works at village Mehanda under PHED Hansi.
o and m dhatrigram
o and m radhanagar baghnapara
Providing and installation of Open well submersible motor at village Durana
o and m nandai
o and m manikhar
o and m sultanpur
Appointment of Third Party Inspection Agencies (TPIAs) for inspection of works to be implemented under Jal Jeevan Mission JJM in Districts Guna
Drilling of 07 Nos 200 150 mm dia 120 m deep tubewells in PWSS for creation of Tubewell source in BAMORI Block District Guna Including all allied works complete
Drilling of 07 Nos 200 /150 mm dia 120 m deep tubewells in PWSS for creation of Tubewell source in ARON Block District Guna Including all allied works complete
Laying of DI pipe line and providing of Pumping Machinery in village Singar
Annual O and M of Biswanathpur , Mirhati , Padam Kandi and Basantapur piped water supply scheme in Khargram Block under Murshidabad Division PHE Dte.
Operation Maintenance of Distribution System,Rising main,Sluice Valves, including operation of sluice valves of RASUIKHANDA PWSS of Raina-I Dev.Block within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1(one)year
Opt. and Mtc. of Distbn. System and R.Main Pipeline(CI/DI/AC/UPVC)including repairing of FHTC Connection for MADHABPUR Zone-I W/S Schemes of Jamalpur Dev. Block within Burdwan Sub-Divn. under Burdwan Divn.,PHE Dte. period for 01 (one)Year.2ND CALL.
Operation and Maintenance of Distribution System,Rising Main,Sluice Valves,including operation of sluice valves of Shyamsundar PWSS of Raina-I Dev.Block within Burdwan Sub-Divn. under Burdwan Division,PHE Dte period for 1(one)year
Providing 01 nos Vehicle and 06 nos Labour for contract basics for Hand Pump Maintenance work in Block Narayanganj of District Mandla.
Providing 01 nos Vehicle and 06 nos Labour for contract basics for Hand Pump Maintenance work in Block Bijadandi of District Mandla
Engagement Of Loading Vehicle And Manpower For Sample Collection And Chlorination Of Drinking Water Sources For Block Mandla District Mandla
Supply of Bleaching Powder for Badi Khairi and Saliwara Group Water Supply Scheme of District Mandla.
Repairs works to various electrical and mechanical machinery installed at Various Water Supply Schemes of Bomai Section of Jal Shakti (PHE) Mechanical Sub Division Sopore under M and R
Electrical repairs to 15 HP Submersible Motor of sump of WSS Maidanpora Lolab under M and R
Operation of sluice valves of Amarpur in Ausgram-II of Amarpur PWSS under Durgapur Water Supply Division, PHE Dte.(181 days) w.e.f 04.05.2026 to 31.10.2026)
Electric repair works to be carried out at WSS Sumbal Town Stage 1st under M and R
Construction of Boundary Wall and allied works at 3rd T/W Site Chapra Bangaljhi Water Supply Scheme Under Krishnagar Sub-dividion Under Nadia Division
PIPED WATER SUPPLY SCHEME FOR On Risk & Cost PIPED WATER SUPPLY SCHEME FOR Village- Koti(Imlidand,Khaspara,Korwapara) Koti(Panditpara) Koti (daridih, Pateratola, Purankoti) BLOCK- Wadrafnagar District – Balrampur(C.G.) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 00 KL capacities – 00 No. & staging 12 mtr& staging And STEEL STRUCTURE 09 M HEIGHT & 10 KL (5000L X 2NO.)- 00 No.} PE TANK & Elevated Service Reservoirs of RCC Staging and HDPE Slim Tank of capacity 5000 Ltr of 00 No. 9 mtr staging (with switch room of size 1.8mx1.8mx3m) and 10000 Ltr of 00 No. 12 mtr staging.including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber.Providing, laying, jointing, interconnection, testing and commissioning of rising main UPVC class 10 kg/sqcm 90 mm dia 00 m & HDPE 75mm dia 00 m & 63 mm dia 840 m., distribution UPVC class 6kg/sqcm 90mm dia. 00 m., 110 mm dia. 00 m., 140 mm dia. 00 m. 160 mm dia. 00 m.& distribution HDPE class 6kg/sqcm 63 mm dia. 550 m., 75 mm dia. 1000 m.with suitable joints GI Pipe, valve, specials and all fittings including all allied civil works, Supplying & Installation of Energy taging n five star BEE rating ISI Marked required capacity single phase / three phase, 50 Hz, 220V,, deep well submersible pump Stainless Steel body, suitable for 4”/6” tube well with Contral Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSPDCL, construction of brick masonry switch room, construction of boundary wall around the over head tank, installation of electro chlorinator , construction of chlorinator room of providing functional household tap connection (F.H.T.C. 0 ) in individual households and government instiution etc. complete with trial run of 03 months after that O&M of 06 months under Village-Koti(Imlidand,Khaspara,Korwapara)Koti(Panditpara) Koti(daridih,Pateratola,Purankoti) BLOCK- Wadrafnagar District – Balrampur(C.G.)
PIPED WATER SUPPLY SCHEME FOR On Risk & Cost PIPED WATER SUPPLY SCHEME FOR Village- Darridih ( Uraopara, Purvtola ,Khaspara ) BLOCK- Balrampur District – Balrampur(C.G.) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 00 KL capacities – 00 No. & staging 12 mtr& staging And STEEL STRUCTURE 09 M HEIGHT & 10 KL (5000L X 2NO.)- 00 No.} PE TANK & Elevated Service Reservoirs of RCC Staging and HDPE Slim Tank of capacity 5000 Ltr of 00 No. 9 mtr staging (with switch room of size 1.8mx1.8mx3m) and 10000 Ltr of 00 No. 12 mtr staging.including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber.Providing, laying, jointing, interconnection, testing and commissioning of rising main UPVC class 10 kg/sqcm 90 mm dia 00 m & HDPE 75mm dia 00 m & 63 mm dia 00 m., distribution UPVC class 6kg/sqcm 90mm dia. 00 m., 110 mm dia. 00 m., 140 mm dia. 00 m. 160 mm dia. 00 m.& distribution HDPE class 6kg/sqcm 63 mm dia. 1300 m., 75 mm dia. 127 m.with suitable joints GI Pipe, valve, specials and all fittings including all allied civil works, Supplying & Installation of Energy taging n five star BEE rating ISI Marked required capacity single phase / three phase, 50 Hz, 220V,, deep well submersible pump Stainless Steel body, suitable for 4”/6” tube well with Contral Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSPDCL, construction of brick masonry switch room, construction of boundary wall around the over head tank, installation of electro chlorinator , construction of chlorinator room of providing functional household tap connection (F.H.T.C. 46 ) in individual households and government instiution etc. complete with trial run of 03 months after that O&M of 06 months under Village- Darridih ( Uraopara, Purvtola ,Khaspara ) BLOCK- Balrampur District – Balrampur(C.G.)
PIPED WATER SUPPLY SCHEME FOR On Risk & Cost PIPED WATER SUPPLY SCHEME FORVillage- Mahewa ( Gagrimod, Harijanpara) BLOCK-Wadrafnagar, District – Balrampur(C.G.) Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 00 KL capacities – 00 No. & staging 12 mtr& staging And STEEL STRUCTURE 12 M HEIGHT & 10 KL (5000L X 2NO.)- 02 No.} PE TANK & Elevated Service Reservoirs of RCC Staging and HDPE Slim Tank of capacity 5000 Ltr of 00 No. 9 mtr staging (with switch room of size 1.8mx1.8mx3m) and 10000 Ltr of 00 No. 12 mtr staging.including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber.Providing, laying, jointing, interconnection, testing and commissioning of rising main UPVC class 10 kg/sqcm 90 mm dia 00 m & HDPE 75mm dia 00 m &63 mm dia 330 m., distribution UPVC class 6kg/sqcm 90mm dia. 00 m., 110 mm dia. 00 m., 140 mm dia. 00 m. 160 mm dia. 00 m.& distribution HDPE class 6kg/sqcm 63 mm dia. 2390 m., 75 mm dia. 00 m.with suitable joints GI Pipe, valve, specials and all fittings including all allied civil works, Supplying & Installation of Energy taging n five star BEE rating ISI Marked required capacity single phase / three phase, 50 Hz, 220V,, deep well submersible pump Stainless Steel body, suitable for 4”/6” tube well with Contral Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,SS/Nylonwireropeandconnection cable including verification of tubewell yield& Electric connection from CSPDCL, construction of brick masonry switch room, construction of boundary wall around the over head tank, installation of electro chlorinator , construction of chlorinator room of providing functional household tap connection (F.H.T.C. 66 ) in individual households and government instiution etc. complete with trial run of 03 months after that O&M of 06 months under Village- Mahewa ( Gagrimod, Harijanpara) BLOCK-Wadrafnagar, District – Balrampur(C.G.)
Electric repair works to be carried out at WSS Zaingeer Stage 1st A (Wular Stage) under M and R
Charadhamohanpur
Construction of Pump House (3.6Mtr. X 3.0 Mtr.) and allied works at 3rd T/W Site at Chapra Bangaljhi Water Supply Scheme Under Krishnagar Sub-dividion Under Nadia Division
Electrical repairs to 10HP non clog submersible motor at WSS Sadunara Stage 1st under M and R
Electrical Repairs to 60HP VT Motor at WSS Gulshanpora Maidanpora Stage 1st under M and R
Borodoba_Ausgram
Electrical repairs to be carried out to Horizontal Motor of WSS Dargam under M and R
Making cabinet for keeping files and other official records at Junior Engineers room and General section at the office ofAssistant Engineers, Krishnagar Sub Division PHED.
Electrical repairs to be carried out to 60HP VT Motor of WSS Tantraypora Goom Ahmadpora and replacement of MCCBs for WSS Pattan and Ahmadpora (Old) under M and R
Urgent upgradation and Wall panelling at the Office of the Assistant Engineer,Krishnagar Sub Division PHE Dte.
Electrical repairs to be carried out to 40HP VT Motor (02 Nos) and other items for WSS Singhpora under M and R
Electrical repairs to be carried out to 100KVA Sub Station of WSS Singhpora under M and R
Electrical repairs to be carried out to 2 No. of Open Well Submersible Motor of WSS Wussan Aglar (Lolipora and Aglar) Stage 2nd under M and R
Electrical repairs to be carried out to 25HP,33HP, 10HP, 10HP and 7.5HP Submersible and Open Well Submersible Motors of WSS Zangam, Trikolbal, Ghat Palhalan Stage 2nd and Gohal Tengpora Stage 1st and Ghat Palhalan Stage 1st under M and R
Supply_and_Installation_of_Submersible_Pumping_Machinery__Voltage_Stabilizer__Chlorination_System_and_Internal_House_Wiring_for_Tube_well_No__3_at_NRISINHAPUR_Water_Supply_Scheme__BLOCK__AUSGRAM_II__under_CMD__PHE_Dte___Dist___Purba_Bardhaman_
Supply_and_Installation_of_Submersible_Pumping_Machinery__Voltage_Stabilizer__Chlorination_System_and_Internal_House_Wiring_for_Tube_well_No__5_at_ABUJHATI_Water_Supply_Scheme__BLOCK__JAMALPUR__under_CMD__PHE_Dte___Dist___Purba_Bardhaman_