Loading…
Loading…
19,582 results • Latest
PLEASE REFER TO BOQ
Atali Estimate for providing laying jointing and connecting of 4 DI pipeline in balance area of various street of village Atali and Dhani Atali as demanded by Gram Panchayat under Ateli Constituency Distt
NIT NO. 8 2026-27 Replacement of pipeline in drain near the Railway Bridge under CSD VIII under PHED City division II Ajmer
Estimate for laying of 100 mm id dia pipeline and providing and fixing fhtc including all requirements special in village Bhilwara and all other works contingent thereto
Rampura Estimate for laying of 100 mm id dia pipeline in balance area distribution system in village Rampura and all other works contingent thereto
laying of di pipe line
Bhori Estimate for providing laying jointing and connecting of DI pipeline in balance area of various street of village Bhori
Khor Estimate for providing laying jointing and connecting of DI pipeline in balance area of various street of village Khor as demanded by Gram Panchayats in Jan samvad Programme under Ateli Constituency
Permanent Restoration of water supply schemes under SASCI of PHE Sub Division Chowki Choura (Package-II)
Permanent restoration of water supply schemes under SASCI of PHE Sub Division Chowki Choura (Package-I)
Providing, installation, testing and commissioning of Sub. pump set and other allied works at new proposed Bore Well Katli under SASCI
Sinking of 2 nos 300 X200 mm dia Tube Well ,210 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at Proposed Tube Well Site of MOSTAFAPUR W/S Scheme under Arambagh Sub-Division of Hooghly Division, P.H.E. Dte.
Conducting yield test for 24 Hrs. of Tubewells in various villages Block Balaghat, Paraswada of Distt Balaghat. 80 Nos. job
Sinking of 3 nos. tube-well (300 X 200 mm) by D.R. Rig method at HIRAPUR Z-II and UDNA Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.H.E. Dte.
Providing, fitting, installation, testing and commissioning of HC Pumping Unit of reputed make and 150KVA voltage stabilizer including other allied works at Pumping Station Maroli in Kathua.
Conducting yield test for 24 Hrs. of Tubewells in various villages Block Katangi, Khairlanji of Distt Balaghat. 80 Nos. job
Operation and Maintenance of Distribution System,Rising Main,Sluice Valves,including operation of sluice valves of Raina PWSS of Raina-I Dev.Block within Burdwan Sub-Divn. under Burdwan Division,PHE Dte period for 1(one)year
Resistivity survey work in Distt TIKAMGARH
Providing 32 Nos.FHTC at Krishnapur village under RAYAN PART-IV DURGADANGA Piped Water Supply Scheme, Block- Burdwan-I within Burdwan Sub Division under Burdwan Division PHE Dte
Providing, installation, testing and commissioning of pumping machinery and electro-mechanical works along with allied jobs at water supply scheme Janglote Slippage WSS Janglote West under SASCI.
Sinking of tube-well by D.R. Rig method at SANTOSHPUR Piped Water Supply Scheme under CHANDANNAGAR Sub-Division of Hooghly Division P.H.E. Dte.
Resistivity survey work in Distt CHHATARPUR
Sinking of 3rd tube-well by D.R. Rig method, Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W AND Distribution
Resistivity survey work in Distt SAGAR
Handpump Installation and Construction of Plate Form in Distt. TIKAMGARH
Installation of tubewell
Handpump Installation and Construction of Plate Form in Distt. PANNA
Providing of Light inspection vehicle such as Mahindra Bolero, Scorpio of recent and make Model not before 2020 on hire charges basis including POL
Handpump Installation and Construction of Plate Form in Distt. CHHATARPUR
NIT 10 Annual Rate Contract for providing Household Service Connections( HSCs) including one Year Defect Liability Period under the Jurisdiction of Executive Engineer Division Paota
Modification of Ejector Pipeline including allied works in connection with the Gaseous Chlorination Plant at Nandarampur PWSS under South 24-Pgs Mechanical Division, PHE Dte. Block Budge Budge-I
Modification of Ejector Pipeline including allied works in connection with the Gaseous Chlorination Plant at Uttar Roypur PWSS under South 24-Pgs Mechanical Division, PHE Dte. Block Budge Budge-I
Modification of Ejector Pipeline including allied works in connection with the Gaseous Chlorination Plant at Buita PWSS under South 24-Pgs Mechanical Division, PHE Dte. Block Budge Budge-I
Supply and delivery of 15HP pump motor set at PH-1 of Namkhana W/S Scheme under South 24pgs Mechanical Division, PHE. Dte.
Providing and installing 2 Nos Tubewell
Reconstruction of fully damaged manhole chamber i/c de silting and cleaning of manholes and sewer line at Sufiya Maszid area, Section 5 of Sub Div-5, Bhopal
Operation and guarding of the electric operated auto/ manual control pumping machinery at Berelia, Panchgachia, Garia and Brindakhali water supply scheme of Baruipur Block under SMD, PHE Dte.
Operation and guarding of the electric operated auto/ manual control pumping machinery at Moukhali Aug and Kalaria water supply scheme of Canning-I Block under SMD, PHE Dte.
De silting and cleaning of Gravity main sewer line and manholes at V.I.P. Road area under Fatehgarh Sewage Pump House, Bhopal
Operation and guarding of the electric operated auto/ manual control pumping machinery at Homrapolta Aug, Srinagar Aug, Narayanpur Aug, Mallick Kati Aug and Nagartala Aug W/SS of Canning-II Block under SMD, PHE Dte.
Repairing of damaged manhole chamber with cleaning of manholes and sewer line at E-3, Arera colony, Section No. 2 Network Area Bhopal
Operation and guarding of the electric operated auto/ manual control pumping machinery at Badehugly, Bhabanipur, Natagachi, Roypur, Banhoogly and Chakberia water supply scheme of Sonarpur Block under SMD, PHE Dte.
PHER/28 of 2026 27
Reconstruction, Repairing and Rising of damaged Manhole chamber i/c de silting and cleaning of manholes and sewer line at BDA Colony, Kohefiza, Sub Div.-5 PHED Bhopal
Operation and guarding of the electric operated auto/ manual control pumping machinery at Kantipota, Hasanpur, Ramchandrapur and Jagadishpur water supply scheme of Sonarpur Block under SMD, PHE Dte.
Repairing of damaged manhole chamber i/c de silting and cleaning of manholes and sewer line constructed under BWL Project at Section 3 of Sub Div-5, Bhopal
Repairing of damaged manhole chamber with cleaning of manholes and sewer line at E-1, Arera colony, Section No. 1 Network Area Bhopal
Operation and guarding of the electric operated auto/ manual control pumping machinery at Tilkumar Zone-III, and Basanti Aug Zone-II water supply scheme of Basanti Block under SMD, PHE Dte.
Operation and Guarding of the Pumping Machinery and electrical installation of Chlorination system at O.H.R No. 1 of Raghunathpur W/S Project under Purulia Mechanical Division PHE Dte.