Loading…
Loading…
19,099 results • Latest
Repair of pipeline leakage at Village Village Lulwari Badoli Lalgarh and all other works contingent thereto
Repairing of Boundary Wall and Jointing of 3 No. T/Well Village Ghori, Sihol, Chandhut and all other works Contingent thereto.
DNIT for cleaning of boosters at Village Badoli Kushak Ghori complete in all respect and all other works contingent thereto
WBPHE/EE/JMD/NIeT 08_72 OF 2026-2027
Day to Day repair Operation and maintenance of OHR/CI/DI/HDPE/UPVC/AC/GI Rising main and Distribution system for MATIAGACHA water supply scheme under Bongaon Sub-Division, P.H.E.Dte.
DNIT for cleaning of boosters at Village Sihol, Chandhat complete in all respect and all other works contingent thereto
Repair and renovation work of Office building including Sanitary Plumbling work at Mechanical Division and Sub-Division office, P.H.E Dte. ,Purulia.
Ghispur, Providing T/Well Against Abandoned T/Well, Block Radaur,Constituency Radaur, District Yamuna Nagar.RECALL
Construction of UGT, laying of pipe line, Drilling of tube well and Providing FHTC in dhanies of village Jhimrawat i.e. Illi bass, Kora bass, Padavdiya bass, Rattan bass, Nambardar bass, Ruggala bass, Sapatha kas bass, chiper bass, Jomkha Bass, Dhund
Restoration of Major District Road (MDR) from Bagnan to Amta damaged due to laying of Distribution Pipeline for different PWSS under Uluberia Sub-Division under Howrah Division, P.H.E. Dte.
Construction of switch room SLOPE ROOF (5.40m x 3.60 m) with water supply sanitary arrangement at 2nd TW site of Hijlok PWSS of Bagnan-I Block under Uluberia Sub-Division under Howrah Division, P.H.E. Dte. (As per approved drawing of Howrah Di
Repairing of Damaged Distribution pipeline and damaged House connections at Jhujka village under Satra W/S scheme under Purulia Sadar sub Division under Purulia Division , PHE Dte.
WBPHE/EE/JMD/NIeT 08_71 OF 2026-2027
Providing and erection of IOCL crossing Information Board (size 0.45m dia) at different demarcated sanctioned location within command area of different PWSS under uluberia Sub-Division, under Howrah Division P.H.E. Dte. (no of Location 90 nos)
Daily Operation mtc. of all distribution system, opening closing of sluice valves with all allied works related to water supply under Para W/S Scheme of Raghunathpur Sub-Division under Purulia Division, P.H.E. Dte.(w.e.f. 01-09-2026 to 31-08-2027
Laying of Distribution system including providing Functional House hold Tap connection (FHTC) for Dhopahat and adjoining mouzas under Dhopahat Water Supply Scheme of Tehatta-I Block under Nadia Arsenic Civil Division II P.H.E. Dte., Dist - Nadia
Yamuna Nagar, Providing and installation of 62.50 KVA DG Set with Foundation and Shed and 2 Nos. Non-Rising Gate Valves for Storm Water Management at Intermediate Pumping Station Buria, Block Jagadri, Constituency Yamuna Nagar
Laying of Distribution System including specials..all complete ..Providing FHTC including supplying, laying...all complete for Augmentation of Ground Based WS Scheme at Teinpur Zone-II..under Nadia Divn, PHE Dte.
Engagement of 5 personnel in Water Testing Laboratories under Hooghly Division PHE Dte.
WBPHE/EE/JMD/NIeT 08_68 OF 2026-2027
Renovation of Water Supply Scheme
Providing and installation of Air Blowers with Panels, Variable Frequency Drive, DO Meter, Fine Screen, Fine Bubble diffuser to improve the Quality treated effluent Discharge.
WBPHE/EE/JMD/NIeT 08_67 OF 2026-2027
Providing and installation of Air Blowers with Panels,Variable Frequency Drive , DO Meter and Pumps at MPS to improve the Quality treated effluent Discharge
WBPHE/EE/JMD/NIeT 08_66 OF 2026-2027
Drilling of Combination Tubewell
WBPHE/EE/JMD/NIeT 08_65 OF 2026-2027
Construction of Approach Road Land Development at HW Site Chitrasenpur PWSS scheme under Udaynarayanpur Block under Uluberia Sub-Division, under Howrah Division P.H.E. Dte.
WBPHE/EE/JMD/NIeT 08_63 OF 2026-2027
Operation Maintenance of Distribution System,Rising main,Sluice Valves, including operation of sluice valves of KUSHA PWSS ofBurdwan-II within Burdwan Sub-Division under Burdwan Division, PHE Dte Period for 1year
Engagement of 9 personnel of new water testing laboratories under Hooghly Division PHE Dte.
Operation Maintenance of Distribution System,Rising main,Sluice Valves,including operation of sluice valves of HARIGRAM PWSS of BurdwanIIwithin Burdwan Sub Division under Burdwan Division,PHE Dte Period for 1 year
AS PER BOQ
Drilling of 400 200 mm Dia 60mtr. Deep G.P TubeWell without material and 7.5 H.P. Motor Pump Set Work at Sahayak Sanchalak Matasyodhog District KATNI
Day to Day Operation, efficient monitoring and Maintenance in all respect for Kardaha PWSS and Vior PWSS (Block - Tapan), under Balurghat Division, P.H.E. Dte.
Drilling of 120 mtr deep 25 No 125 115 mm dia ORDINARY Tube well with installation of HP in Various Villages of District KATNI
Upgradation and restoration water supply scheme Shava Gravity Mohalla Kartar Chand under District Capex Budget.
Providing and fixing of G.S.Sheet to roof of CPS and 1.25 lacs Gln GSR Nowshera Town under District Capex Budget.
Arrear payment of IEP operator on account of enhance of rate of wages for the period from 01/01/2025 to 31/12/2025 for i) Dignagar ii) Dafarpota Zone-II and iii) Bablari Dewanganj W/S Scheme under Krishnagar Sub-Division PHED.
Cleaning of 02 Nos Dugwells by way of removal of mud mulba and Silt clearance under WSS Nonial and WSS Chowki Hundan (District Capex Budget).
Laying of balance Distribution of pipeline and allied works for Augmentation of Chakbhrigu Piped Water Supply Scheme (Block-Balurghat) under Balurghat Division, PHE Dte in the District of Dakshin Dinajpur.
Dharmadanga Rising Main
Special Repairing including Complete Overhauling of different types of filter media and other allied works of Iron Elimination Plant at Balurghat District Hospital PWSS and D.M Bungalow in the District of Dakshin Dinajpur.
Daily Operation mtc. of distribution system, sluice valve, FHTC etc. For Zone-III Bongabari W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte. For the period of 01.09.2026 to 31.08.2027
Daily Operation Mtc. of distribution system at Zone-II Panradda W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte For the period of 01.09.2026 to 31.08.2027
Daily Operation mtc. of rising main (from Mohara Boosting pump house to Bongabari OHR) distribution system, sluice valve, street stand post of Bongabari area (Zone-II) including Bongabari OHR to Medical college pipe line under Bongabari W/S Sche
Sinking of 03 (Three) nos. 100mm x 50mm dia India Mark II Tube well with allied works at different location of Harirampur and Gangarampur Block in the district of Dakshin Dinajpur.
Stabilization of water supply scheme at Thandipora Bala under PRI
Construction of approach paths to T/W No. 1 and 2 at Bani temple Prithla
Collection of Functional House Hold Tap Connection details in prescribed format under JJM Programme including uploading in IMIS portal for Gangarampur Sub Surface piped water supply scheme in the District of Dakshin Dinajpur.