Loading…
Loading…
18,388 results • Latest
Fabrication of two number of fire hydrants on street no 374 353 near Plot no. IIA /25 and IIA /25/1 for fire fighting arrangements to improvise structure in connection with arrive, departure of Haj Pilgrims along with fabrication of two M.S. spou
Construction of G plus 3 Storied RCC Residential Building at Store and Workshop Division (PHE) Complex , Betkuchi,
e/m WORKs
Gohida- Drilling of 1 No. Tubewell in lieu of abandoned Tubewell.
Electro mechanical works
Temporary water supply arrangement including operation maintenance work at Plot No. 11A/25 11A/25/1 adjacent to Madinat-Ul-Hujjaj in connection to newly constructed temporary toilet block for arrival, departure of Haj Pilgrims in respect of Haj O