Loading…
Loading…
18,434 results • Latest
HYDROFRACTURING OF TUBEWELLS FOR DEVELOPMENT OF YIELD OF EXISTING TUBEWELL IN DIFFERENT VILLAGE OF BLOCK BADNAGAR (40 Nos)
Sinking of 4 nos New 200 mm dia horizontal tube-well and laying of 100mm dia GI pipe collecting main from RBT to common manifold at river side of Beldi Head Works site of Beldi water supply scheme under Purulia Division, P.H.E. Dte.
HYDROFRACTURING OF TUBEWELLS FOR DEVELOPMENT OF YIELD OF EXISTING TUBEWELL IN DIFFERENT VILLAGE OF BLOCK KHACHROD (40 Nos)
Carrying of water by hired vehicle including fuel, filling water at lifting point and unloading at different habitation to mitigate drinking water crisis for 8 Nos location within Raghunathpur-II Block of Raghunathpur Sub-Division under Purulia Div
HYDROFRACTURING OF TUBEWELLS FOR DEVELOPMENT OF YIELD OF EXISTING TUBEWELL IN DIFFERENT VILLAGE OF BLOCK GHATIYA (30 Nos)
HYDROFRACTURING OF TUBEWELLS FOR DEVELOPMENT OF YIELD OF EXISTING TUBEWELL IN DIFFERENT VILLAGE OF BLOCK UJJAIN (30 Nos)