Loading…
Loading…
19,230 results • Latest
Day to Day Operation Maintenance of distribution system rising main (CI/DI / HDPE/ UPVC) with all related assets for CHAUKA(Zone-1), CHAUKA (Zone-2), Raghunathpur (Zone-2) pwss within Ghatal Block in Ghatal Sub Division Within Midnapore Division
WBPHE/EE/JMD/NIeT 06_30 OF 2026-2027
Regular maintenance of RWSS Dujana under Sub Division Sumerpur
Unbranded Waste Container made of Low-Density Polyethylene (LDPE) with a Capacity of 25 liter
Regular maintenance of RWSS Bankli under Sub Division Sumerpur
Day to Day Operation Maintenance of distribution system and rising main (CI/DI / HDPE/ UPVC) with all related assets for Masharpur(Zone-1), Bhagirathpur (Zone-1), Bhagirathpur (Zone-2) pwss within Ghatal Block in Ghatal Sub Division Within Midnapor
Bone China Porcelain 6 pcs Cups, Saucers, Tea Pot, Milk/Cream Pot & Sugar Pot Tea Set
WBPHE/EE/JMD/NIeT 06_29 OF 2026-2027
WBPHED/EE/JD/e-NIT- 06/2026-27 (Sl.No.25)
Daily Operation mtc.of all rising main and entire distribution system Sluice Valve, Street Stand Post etc. under Khudagara W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte
Unbranded Microfiber Flat Moper
WBPHE/EE/JMD/NIeT 06_28 OF 2026-2027
Operation and guarding of Pumping Machineries at Clear Water Pumping Station at Water Treatment Plant (Phase-I) under NTK Water Supply Project.
WBPHE/EE/JMD/NIeT 06_27 OF 2026-2027
Operation and guarding of Pumping Machineries at Raw Water Pumping Station at Water Treatment Plant under NTK Water Supply Project.
Unbranded Stainless Steel(304) Burner Stock pot stove With
Unbranded Stainless Steel Grade 304 galvanized Shelf Rack With 3- Shelf (including top shelf), Unbranded Stainless Steel Grade 304 galvanized Shelf Rack With 3-Shelf (including top shelf)
WBPHE/EE/JMD/NIeT 06_26 OF 2026-2027
Connection of newly sunk Replaced TW with rising main by DI pipe, additional laying of pipe line with UPVC pipe due to damage of existing pipe line for Augmentation of Panchita WSS, Bongaon Block within Bongaon Sub-Divi under Barasat Division, PHEDte
Operation and guarding of Boosting Pumping Station (BS-I) at AA-I under NTK Water Supply Project.
Construction, Successful, testing and Commissioning of Providing, laying and fitting of DI/GI Raw Water main, supply mains, distribution Network and Anchor Blocks,etc on EPC mode (Turn Key Basis) for WSS Repora Bala under UT Capex/Languishing
Recall - Operation and Maintenance of water supply scheme Khudan
OKAYA VIVA NDP/150 Ah Stationary Lead Acid Battery with Tubular Positive Plates
Removal of Leakage in various PandT under JEN Section (D-1) under jurisdiction of PHED Sub. Dn. City, Nagaur (Financial year 2026-27)
Operation and guarding of 33KV Sub-Station for Raw water Intake Station at Rani Debendrabala ghat on River Hooghly under NTK Water Supply Project.
Survey and preparation of DPR Survey and preparation of DPR Survey and preparation of DPR
WBPHE/EE/JMD/NIeT 06_25 OF 2026-2027
WBPHED/EE/JD/e-NIT- 06/2026-27 (Sl.No.24)
WBPHE/EE/JMD/NIeT 06_24 OF 2026-2027
Repairing and renovation of Boundary wall, Earth Filling, Concreting and Repairing and renovation of Pump House with sanitary and water supply arrangement at 2nd TW Site of Helencha WSS, Bagdah Block within Bongaon Sub-Div under Barasat Division,PHED
Bhola Ka bass (Dahmala) - Rough Cost Estimate For Providing Water Facility to The 60 No. Households of DHANI Bhola Ka bass, Village Dahmala Block FP Jhirka Dist. Nuh by Laying of DI Rising main pipeline, distribution pipelines, installtion of 01 No
Overhauling of 33KV Breaker and LT panel with allied works at BS-I, AA-I in New Town under NTK Project.
WBPHED/EE/JD/e-NIT- 06/2026-27 (Sl.No.23)
WBPHE/EE/JMD/NIeT 06_23 OF 2026-2027
Supply and installation of 02 nos. ceiling mount type Cassette AC and allied works at the Chamber of Honerable MOS at Janaswasthya Karigari Bhawan.
Special Repairing work in connection with Augmentation work at total command area of Ichhapur WSS, to repair the damaged pipeline due to road widening and drain construction within Bongaon Sub Division, under Barasat Division, PHE Dte.
WBPHE/EE/JMD/NIeT 06_22 OF 2026-2027
Daily Operation mtc.of rising main all distribution system Sluice Valve, Community Stand Post under Jhalda Municipality W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte.
Additional pumping arrangement during Monsoon 2026 by diesel driven centrifugal pump sets for dewatering near CC-II DPS in AA-II during period (July 2026 to Oct 2026).
WBPHED/EE/JD/e-NIT- 07/2026-27 (Sl.No.27)
Construction of Boundary wall at Head Work site for Augmentation of Ichhapur Water Supply Scheme, Gaighata Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte.
Supply and delivery of Electrolytic Grade Copper and rewinding of Transformer at Debendrabala Ghat Intake Station under NTK Project.
WBPHED/EE/JD/e-NIT- 07/2026-27 (Sl.No.24)
Construction of temporary latrine, toilet, Hand Washing Unit(bib cock,pipe and fittings etc.), vat, Sinking of temporary TW including sinking of New TW with submersible pump at Mabarakpur High School
Special Repairing work in connection with augmentation work at total command area of Chikanpara WSS, to repair the damaged pipeline due to road widening and drain construction, ..... within Bongaon Sub Division, under Barasat Division, P.H.E.Dte.
WBPHE/EE/JMD/NIeT 06_21 OF 2026-2027
Construction of India mark- II Hand Pump 05 Nos at various village in MLA constituency Nohar under sub div. Nohar under div. Nohar
WBPHED/EE/JD/e-NIT- 07/2026-27 (Sl.No.21)
WBPHE/EE/JMD/NIeT 06_20 OF 2026-2027
Construction of temporary latrine, toilet, Hand Washing Unit(bib cock,pipe and fittings etc.), vat, Sinking of temporary TW including sinking of New TW with submersible pump at Natna High School