Loading…
Loading…
18,453 results • Latest
Round the Clock Operation and Guarding of Pumping Machinery, 200 KVA Boosting Transformer (11KV/0.433KV), Lighting Arrangement and other allied works at INTAKE PUMPING STATION under Surface Water Based W/S Scheme, Northern Sector, Part-I (Kaliganj),
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), RBTW with Collecting Line, Stand Post, FHTC and operation of sluice valve of Improvement of Hirbandh and Adjoining Mouzas
Round the clock Operation Guarding of Pumping machinery, Sub-Station (2 x 1600 KVA, 11KV/0.433KV Transformer), Sludge Pump, Recirculation pump, Gaseous Chlorination system, other allied works at Water Treatment Plant under Surface Water Based W/S Sch
Sudhail, Replacement of AC/PVC Pipe Line to D.I Pipe Line and laying of new D.I pipe line, Block Jagadhri, Constituency Radaur, District Yamuna Nagar.
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), RBTW with Collecting Line, Stand Post, FHTC and operation of sluice valve of Champabani and its adjoining mouzas under water supply scheme
The work of running of existing pumphouses all work complete under Project Division-I (S) Jaipur