Loading…
Loading…
18,338 results • Latest
WORK FOR HP REPARING UNDER CITY DIVISION 2 UDAIPUR
Const. of RCC S/S tank, Const. of Boosting Station, Distribution Pipe Line and Restoration of Water Connection
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Tubewell with Connecting Line, Stand Post, FHTC and operation of sluice valve for ROL ZONE-B BRGF Scheme (Phase-I) under INDAS Block
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Tubewell with Connecting Line, Stand Post, FHTC and operation of sluice valve for SASHPUR ZONE-B BRGF Scheme (Phase-I) under INDAS Block
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Tubewell with Connecting Line, Stand Post, FHTC and operation of sluice valve for AMRUL ZONE-B BRGF Scheme (Phase-I) under INDAS Block
Sagri Village, Providing and installing 1 No. Tubewell and Laying of Distribution System for 65 Nos. Houses holds of Mahatma Gandhi Gramin Basti, Block Radaur, Constituency Radaur, District Yamuna Nagar