Loading
Loading…
Loading…
18,340 results • Latest
Pproviding laying, jointing and testing of DI Pipe Line under division Jalore
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Tubewell with Connecting Line, Stand Post, FHTC and operation of sluice valve for AKUI ZONE-A BRGF Scheme (Phase-I) under INDAS Block
Drilling of 1No. tubewell (250m Depth), Pumping Machinery, Rising Main 150mm DI Pipe- 40m
2484 Mtr. 100mm DI pipe
Rising of manhole
Day to day Operation and Maintenance of Distribution system and Rising Main pipeline (DI/CI/UPVC/HDPE), Tubewell with Connecting Line, Stand Post, FHTC and operation of sluice valve for BETANAL ZONE-B BRGF Scheme (Phase-I) under INDAS Block