Loading…
Loading…
19,233 results • Latest
Hiring and Operation of diesel engine driven centrifugal pump sets for dewatering at Sulongori during monsoon period.
Providing FHTC of Chanda, Gangrapota, Gobrapur and Kamalapur mouzas including laying of UPVC pipe with pile work under Augmentation work at Gangrapota W/S Scheme Bongaon block under of Bongaon Sub-Division under Barasat Division, P.H.E. Dte
Day to Day Operation Maintenance of distribution system rising main (CI/DI / HDPE/ UPVC) with all related assets for Sonakhali Piped Water Supply Scheme Within Daspur-II Block under Ghatal Sub Division Within Midnapore Division,PHE Dte. ( For 1
Hiring and Operation of diesel engine driven centrifugal pump sets for dewatering around different location at Bonamalipur Mouza under Beonta-II GP during monsoon period.
Comprehensive Mtc. and Operation of Distributions, Consumable items, T and P items safety equipment, Comprehensive Mtc. Operation, Repair and desilting of Inlet channel etc. Complete in all respect.
Day to Day Operation Maintenance of distribution system rising main (CI/DI / HDPE/ UPVC) with all related assets for Shimulia Piped Water Supply Scheme Within Ghatal Block under Ghatal Sub Division Within Midnapore Division,PHE Dte. ( For 12 Mo
Hiring and Operation of diesel engine driven centrifugal pump sets for dewatering at Thakurtala in Bonamalipur village during monsoon period.
Providing FHTC of Kundipur, Kundipur Jalkar and Keutipara mouza including laying of UPVC pipe under Augmentation work at additional Gangrapota and Gangrapota WSS, Bongaon block under Bongaon Sub-Division under Barasat Division, P.H.E. Dte.
Route survey and way leave permission along and across of National Highway in Augmentation of Salboni PWSS under Midnapore Sadar Sub_Division of Midnapore Division PHE Dte.
Route survey and way leave permission along and across of National Highway in Augmentation of Garhbeta PWSS under Midnapore Sadar Sub_Division of Midnapore Division PHE Dte.
Day to Day Operation Maintenance of distribution system rising main (CI/DI / HDPE/ UPVC) with all related assets for Sahapur Piped Water Supply Scheme Within Daspur-I Block under Ghatal Sub Division Within Midnapore Division,PHE Dte. ( For 12 M
Hiring and Operation of diesel engine driven centrifugal pump sets for dewatering at Akanda Keshori (Dakhin para), AA-IIID during monsoon period.
Route survey and way leave permission along and across of National Highway in Shyamnagar PWSS under Midnapore Sadar Sub_Division of Midnapore Division PHE Dte.
Route survey and way leave permission along and across of National Highway in Patharisol PWSS under Midnapore Sadar Sub_Division of Midnapore Division PHE Dte.
Day to Day Operation Maintenance of distribution system rising main (CI/DI / HDPE/ UPVC) with all related assets for Ranirbazar Piped Water Supply Scheme Within Ghatal Block under Ghatal Sub Division Within Midnapore Division,PHE Dte. ( For 12
Hiring and Operation of diesel engine driven centrifugal pump sets for dewatering at CC-II in AA-II during monsoon period.
Restoration of damaged pipe line due to Construction of Pucca Drain by laying of UPVC pipe at different places under Chhaigharia G.P., Bongaon Block of Chhaigharia (Z - III) WSS under Bongaon Sub-Division under Barasat Division, P.H.E. Dte
Repairing and replacement of pumping machinery and allied works at P.H.No- High Lift of Hariharpur Ground water-based W/S Scheme under EMD ,PHE Dte.in 24Pgs(N).
Comprehensive Mtc. and Operation of Distributions, Consumable items, T and P items safety equipment, Taking out Top layer filter media and replacing the same after screened, washed and cleaned, Comprehensive Mtc. Operation, Repair and desilting of
Route survey and way leave permission along and across of National Highway in Pachadahara PWSS under Midnapore Sadar Sub_Division of Midnapore Division PHE Dte.
Hiring and Operation of diesel engine driven centrifugal pump sets for dewatering beside DLF boundary (Naskarhati) on the left flank of Bagjola Khal at AA-IIF during monsoon period.
Supply and installation of one (01) no. Horizontal Centrifugal High Lift Pumping machinery at High Lift P/H of Khulna Bhanderkhali Water Supply Scheme Zone-II with other allied works in the district of 24 pgs.(N) under Eastern Mechanical Division, PH
Route survey and way leave permission along and across of National Highway in Kuilabad PWSS under Midnapore Sadar Sub_Division of Midnapore Division PHE Dte.
Day to Day Operation Maintenance of distribution system rising main (CI/DI / HDPE/ UPVC) with all related assets for Ranichak Piped Water Supply Scheme Within Daspur-II Block under Ghatal Sub Division Within Midnapore Division,PHE Dte. ( For 12
Route survey and way leave permission along and across of National Highway in Gangani PWSS under Midnapore Sadar Sub_Division of Midnapore Division PHE Dte.
Hiring and Operation of diesel engine driven centrifugal pump sets for dewatering near pond-school (Naskarhati) on the left flank of Bagjola Khal at AA-IIF during monsoon period.
Comprehensive Mtc. and Operation of Distributions, Consumable items, T and P items safety equipment, Comprehensive Mtc. Operation, Repair and desilting of Inlet channel etc. Complete in all respect.
Day to Day Operation Maintenance of distribution system rising main (CI/DI / HDPE/ UPVC) with all related assets for Ranapur Piped Water Supply Scheme Within Daspur-I Block under Ghatal Sub Division Within Midnapore Division,PHE Dte. ( For 12 M
Additional laying of UPVC pipe to connect every house hold FHTC with Augmentation work at Chhaygharia (Zone-I) W/S Scheme under Bongaon block within the jurisdiction of Bongaon Sub-Division, under Barasat Division, P.H.E. Dte
Hiring and Operation of diesel engine driven centrifugal pump sets for dewatering at Chowdhury Para, AA-II during monsoon period.
Day to Day Operation Maintenance of distribution system rising main (CI/DI / HDPE/ UPVC) with all related assets for Ramkrishnapur Piped Water Supply Scheme Within Daspur-I Block under Ghatal Sub Division Within Midnapore Division,PHE Dte. ( Fo
Operation and Maintenance of various water supply schemes including all installation pumping machinery, rectification of leakage, rising main, sub rising main and distribution pipe line along with T/Wells and VBS pumping machinery, repair of civil
Supply and installation of one (01) no. Horizontal Centrifugal High Lift Pumping machinery at High Lift P/H of Khulna Bhanderkhali Water Supply Scheme Zone-I with other allied works in the district of 24 pgs.(N) under Eastern Mechanical Division, PHE
Operation and Maintenance of various water supply schemes including all installation pumping machinery, rectification of leakage, rising main, sub rising main and distribution pipe line along with TWells and VBS pumping machinery and all other works
Hiring and Operation of diesel engine driven centrifugal pump sets for dewatering near OHR-21 (near residence of Judge Saheb Bibek Choudhury) during monsoon period.
Day to Day Operation Maintenance of distribution system rising main (CI/DI / HDPE/ UPVC) with all related assets for Rajnagar (Paschim) Piped Water Supply Scheme Within Daspur-I Block under Ghatal Sub Division Within Midnapore Division,PHE Dte.
Route survey and way leave permission along and across of National Highway at Pakurseni_Govindapur Brahman Saran_Uttar Karkara PWSS of Midnapore Division PHE Dte.
Carrying out the Resistivity Survey work in Villages of Katni District. for 200 Points (2nd Call)
Carrying out the Resistivity Survey work in Villages of Chhindwara District. for 300 Points (2nd Call)
PROCUREMENT OF Sand, BB Metal, Cement Material for 200 No. of Hand Pump Installation and Platform Construction Work (2nd Call)
Sell of Scrap Material, O/o Assistant Engineer, PHE E/M Sub Dn. Katni
Comprehensive Mtc. and Operation of Distributions, Consumable items, T and P items safety equipment, Comprehensive Mtc. Operation, Repair and desilting of Inlet channel etc. Complete in all respect.
Upgradation of 2nd Existing Water Works Kheder Distt. Hisar providing sewerage network system providing sewerage network system
Day to Day Operation Maintenance of distribution system rising main (CI/DI / HDPE/ UPVC) with all related assets for Pratappur Piped Water Supply Scheme Within Ghatal Block under Ghatal Sub Division Within Midnapore Division,PHE Dte. ( For 12 M
Route survey and way leave permission along and across of National Highway at Belda Zone-I_Babalpur_Raipur PWSS of Midnapore Division PHE Dte.
Day to Day Operation Maintenance of distribution system rising main (CI/DI / HDPE/ UPVC) with all related assets for Panna Piped Water Supply Scheme Within Ghatal Block under Ghatal Sub Division Within Midnapore Division,PHE Dte. ( For 12 Month
Additional laying of pipe line with UPVC pipe due to damage of existing pipe line and allied works and construction of IEP back wash drain under Augmentation work at Ashudi WSS at Habra-II Block within Bongaon Sub-Div under Barasat Division, PHE Dte
Route survey and way leave permission along and across of National Highway at Kutki_Kasba Narayangarh_Gokulpur PWSS of Midnapore Division PHE Dte.
Day to Day Operation Maintenance of distribution system rising main (CI/DI / HDPE/ UPVC) with all related assets for Nabin Mahespur Piped Water Supply Scheme Within Daspur-I Block under Ghatal Sub Division Within Midnapore Division,PHE Dte. ( F
Route survey and way leave permission along and across of National Highway at Palasia_Dantan_Bhetiamla_Angua PWSS of Midnapore Division PHE Dte.