Loading…
Loading…
1,347 results • Recent activity
Balance work of Survey, Investigation and Necessary Construction works required for Execution of Retrofitting PWS Scheme in village Bichhua Bhawantara of Block Deori Distt Sagar
100 NOS Handpump installation and platform construction and construction of concrete block over dry tubewells Distt. Dhar
Survey, Investigation, and Necessary Construction of balance work required for Existing Piped Water Supply Scheme of 100 Percent FHTC at Village DEVGAWN, IMLAJ Block RITHI Distt. KATNI
Revise Retrofitting of Existing Piped Water Supply Scheme of 100 Percent FHTC at Village MURAWAL Block RITHI Distt. KATNI
Conducting yield test for 10 Hrs. of Tubewells in various villages of Block Jamai, Sub Division Jamai under Parasia Division. (100 Source)
Carrying out the resistivity survey (200 Nos.) be VES method using schlumberger confirguration for locating the proper spot eith three soundings for drilling of tube well with inVarious villages Block Amarwara and Harrai, Parasia Division, Chhindwara