Loading…
Loading…
1,242 results • Latest
CONSTRUCTION OF ROHANSI TO TEMRI ROAD TOTAL LENGTH= 1.50 KM I/C BRIDGE & CULVERT ON DISTT. BALODABAZAR-BHATAPARA(C.G.)
CONSTRUCTION OF KONARI MAIN ROAD TO MANDI TOTAL LENGTH= 1.00 KM I/C BRIDGE & CULVERT ON DISTT. BALODABAZAR-BHATAPARA(C.G.)
Construction of Additional Class Room and Ladies Toilet Urinal Block at Bishrampur College Campus Distt Surajpur (C.G.)
Construction of Dudungjor (Sarasmar) to Chidrapara Patthalgaon Approach Road Length 2.00Km. Distt. Jashpur (C.G.)
CONSTRUCTION OF HIGH LEVEL BRIDGE I/C APPROACH ROAD ACROSS INDRAWATI RIVER IN KM. 1/2-10 ON USPARI (ITAMPARA TO CHHOTEPALLI) ROAD.
PAINTING WORK UNDER ANNUAL REPAIR IN RESIDENTIAL BUILDING (GROUP - D) UNDER SUB DIVISION NO. 2 , DURG
CONSTRUCTION OF BOUNDARY WALL & DRAIN WORK FOR JUDICIAL AT RAJNANDGAON
SPECIAL REPAIR / ANNUAL REPAIR , MOW WORK & OTHER DEPOSITE WORK OF DIFFERENT RESIDENTIAL & NON RESIDENTIAL BUILDING UNDER PWD SUB DIV. No.01 DURG
PAINTING WORK IN NON RESIDENTIAL BUILDING (GROUP - C) UNDER PWD SUB DIVISION No.1 DURG
CONSTRUCTION OF MISCELLANEOUS WORK IN FARMER HOSTEL REGIONAL INSTITUTE OF AGRICULTURE EXTENSION AND TRAINING RUABANDHA DURG
AR/SR/MOW FOR RESIDENTIAL AND NON RESIDENTIAL BUILDING UNDER P.W.D. SUB DIVISION NO. 2, DURG
Schedule for Providing Line Shifting of 33 & 11 KV Line DP, Transformer DP,33 KV,11KV & LT Line of Gujra to Rivagahan Road Upto 3.00 Km Under CSPDCL Dn. – Kurud , Distt. – Dhamtari (C.G.)
NIT Schedule for Providing Line Shifting of 33 & 11 KV Line DP, Transformer DP,33 KV,11KV & LT Line of NH-30 -Charra- Miradatar -Kurud Road Upto 5.3 Km. ,UnderCSPDCL Dhamtari Zone of CSPDCL Dn. Dhamtari Distt. – Dhamtari (C.G.)
NIT Schedule for Providing Line Shifting of 33 & 11 KV Line DP, Transformer DP,33 KV,11KV & LT Line of Kurud- Charmudiya-Gobra-Seonikala Road Upto 5.3 Km. ,Under CSPDCL Kurud and Mauraud DC Dhamtari Distt. - Dhamtari (C.G.)
Construction of Additional Room Of Rajiv Lochan College , at Rajim, Block - Fingeshwar, Dist.- Gariaband (C.G.)
CONSTRUCTION OF 4 X 8.0 M SPAN BRIDGE AT DAHDHA NALA IN BLOCK-KURUD DIST. DHAMTARI
CONSTRUCTION OF FIRE STATION BUILDING ( STANDARD 3 BAY VEHICLE PARKING ) AT BALODA BAZAR DIVISION RAIPUR (C.G.)
Cleaning & House Keeping Work At- Jaithkhamb and Toilet Block in Girodpuri Dham for, Block- Kasdol, Distt.- Balodabazar- Bhatapara (C.G.)
CONSTRUCTION OF P.W.D. (B&R) SUB DIVISIONAL OFFICE RAJIM AT DISTT. GARIYANBAND
CONSTRUCTION OF HIGH LEVEL BRIDGE AND APPROACH ROAD ON CHANDANA NALA AT CHANDANA - CHANDRASUR ROAD IN DIST. DHAMTARI
CONSTRUCTION OF LIBRARY HALL AT SCIENCE COLLEGE RAIPUR(C.G.)
CONSTRUCTION OF GIDHORI CHOWK TO SEORINARAYAN BRIDGE, PART OF PAMAGARH- SEORINARAYAN - SARANGARH ROAD KM 66/10 TO 67/2(100) LENGTH = 0.30KM BLOCK-KASDOL, DISTT-BALODA BAZAR (C.G.)
CONSTRUCTION OF NAYAPARA TO ACHHARIDIH ROAD LENGTH 1.20 KM, DIST. MAHASAMUND (C.G.)
CONSTRUCTION OF VETERINARY DISPENSARY AT DATAN BLOCK -PALLARI, DISTT.- BALODABAZAR-BHATAPARA (C.G.)
CONSTRUCTION OF VETERINARY DISPENSARY AT KONARI BLOCK -PALLARI, DISTT.- BALODABAZAR-BHATAPARA (C.G.)
Construction of 1 Span X 10 Meter Slab Culvert (Approach Road Length 0.50 Km) on The Masapara to Kawrakopa Bandhrpal Road, Block-Chhindgarh, District-Sukma.
SUPPLY,INSTALLATION,TESTING & COMMISSIONING OF OUTDOOR TYPE 33/.4 KV 2X500 KVA TRANSFORMER SUB-STATION, ELECTRICALS PANELS & UNDER GROUND CABLE LAYING FOR POWER SUPPLY DISTRIBUTION SYSTEM AT GOVT. V.Y. T. AUTONOMOUS DEGREE COLLEGE DURG, DIST,-DURG (C.G.)
Providing Fixing Electrification works in Cultral Hall Building at English Medium School Bemetara District Bemetara (C.G.)
CONSTRUCTION OF INTERNAL ROAD OF NARDAHA,LENGTH 2.00 KM, I/C. CULVERTS AT DIST. RAIPUR. ( VIDHANSABH DN. RAIPUR).
:- 1- CONSTRUCTION OF KHADAMACHA KODRO TO KHADAMACHA ROAD IN KM. 4.80 DISTT. JASHPUR C.G. (Work code – W29146) 2. CONSTRUCTION OF MUDAPARA HADDI GODAM MAIN ROAD TO GHICHAPANI PANGSUWA ROAD IN KM. 4.85 DISTT. JASHPUR C.G. (Work code – W29093)
GARDEN DEVELOPMENT WORK IN THE RESIDENTIAL COMPLEX OF SENIOR OFFICERS AT SECTOR 18 I/C. ELECTRIFICATION WORK AT DISTT.RAIPUR(NAWA DIVISION, NAWA RAIPUR).
1- CONSTRUCTION OF KOKIYAKHAR TO AAMAKANI ROAD IN 4.00 KM, DISTT. JASHPUR C.G. (Work code – W29184) 2. CONSTRUCTION OF MAIN ROAD KOTBA TO SARAIKONA PICKUP WEAR ROAD IN 4.60 KM., DISTT. JASHPUR C.G. (Work code – W29153)
CONSTRUCTION OF GRAM PANCHAYAT KUDKELKHAJRI,PATELPARA TO BAGAIJHARIYA APP. ROAD LENGTH 3.80 KM. DIST- JASHPUR (C.G.) (WORK CODE- W29157 .
CONSTRUCTION OFBATAULI - BAGICHA MAIN ROAD BAGDOL TO JHAGARPUR APP. ROAD LENGTH = 1.80KM, BLOCK - BAGICHA, DISTT.-JASHPUR (C.G.) WORK CODE-W29000
1. CONSTRUCTION OF GRAM PANCHAYAT KORANGA NAWATOLI TO BHAGALPUR APPROACH ROAD LENGTH 2.00 KM. i/c CULVERT Distt- Jashpur (Work code – W29191), 2. CONSTRUCTION OF BATAIKELA PREMNAGAR TO MIRCHAIDHODHIDHIDHI APPROACH ROAD LENGTH 2.90 KM. i/c CULVERT Distt- Jashpur (Work code – W29107)
CONSTRUCTION OF GOVT. NAVIN COLLEGE, GOHRAPADAR(BLOCK-MANPUR) I/C. WATER SUPLY, SANITERY FITTINGS, & ELECTRIFICATION WORK AT DISTT. GARIYABAND.(DN. GARIYABAND) UNDER NABARD POSHIT YOJNA.
CONSTRUCTION OF GOVT. COLLEGE BUILDING I/C. WATER SUPPLY & SANITERY FITTINGS AND ELECTRIFICATION WORK AT KANDEL, DISTT. DHAMTARI.( DHAMTARI DN.) NABARD POSHIT YOJNA.
CONSTRUCTION OF KANDANAR TO MURIYAMIPARA ANDALPARA ROAD LENGTH KM 1/2 TO 9/6 = 8.5 K.M BLOCK-DARBHA, DISTRICT- BASTAR.
CONSTRUCTION OF STRENTHENING OF ANTAGARH - BEDMA ROAD 36/2 TO 65/10 = 29.875 KM Work Code :- W29415
CONSTRUCTION OF JAITGIRI TO BARPAGUDA ROAD LENGTH 4.30 K.M. (WORK CODE – W29793)
BALANCE WORK OF HIGHER SECONDARY SCHOOL BUILDING (SWAMI ATMANAND HINDI MEDIUM SCHOOL ) AT, RAMLEELA MAIDAN DISTRICT RAIGARH (C.G.)
Construction of Senior Agriculture Development Officer Office Building at Awapalli, Block-Usoor, Distt-Bijapur (C.G.). Division / District Name
CONSTRUCTION OF 1X2.00 M SLAB CULVERT ON KAWARDHA TO RENGAKHAR VIA MADAGHAT ROAD AT KM 30/8, RETAINING WALL ON KAWARDHA TO RENGAKHAR VIA MADAGHAT ROAD AT KM 34/8 (RIGHT SIDE) & 3X1200 MM DIA HUME PIPE CULVERT ON KAWARDHA RENGAKHAR VIA MADAGHAT ROAD AT KM 34-6 & KAWARDGA RENGAKHAR MADAGHAT ROAD KM. 38.20 RECONSTRUCTION WORK OF TOE WALL BOULDER PICHING IN THE PORRTION DAMAGED DUE TO HEAVY RAIN AT UNDER SUB DIVISION- BODLA
CONSTRUCTION OFSARSWATI SHISHUMANDIR SUDHAVIHAR BHAGUTOLA TO JEWDAN ROAD , LENGTH 1000.00 M
S/R WORK FOR CONSTRUCTION OF 2.00 M SPAN SLAB CULVERT ON BHOTHI APPROACH ROAD AT KM 1/6, OF 2.00 M SPAN SLAB CULVERT ON BOKKARKHAR TO KABRIPATHRA ROAD AT KM 5/2 UNDER SUB DIVISION- BODLA
S/R Work for Restoration of Embankment of Ghat Portion on Bodla-Taregaon-Daldali Road at Km 36/6(PART 1), Restoration of Embankment of Ghat Portion on Bodla-Taregaon-Daldali Road at Km 36/6(PART 2) & Restoration of Embankment of Ghat Portion on Bodla-Taregaon-Daldali Road at Km 36/4 (Right Side) Under Sub Division Bodla, District- Kabirdham (C.G.)
Special Repair Work on Various Roads Restoration of Embankment & Shoulder With Protection Work on Kawardha-Bhoramdeo-Palak Road Km 10/6, Restoration of Embankment on Sarodha-Bhoramdeo Road at Km 15/2) Under Sub Division Bodla, District- Kabirdham (C.G.)
CONSTRUCTION OF CC ROAD FROM INDIRA NAGAR JUNWANI ROAD CH 1/8 TO NEW DEENDAYAL COLONY JUNWANI , FROM CH 1/10 TO DEENDAYAL COLONY JUNWANI , FROM CH 3/2 TO JUNWANI KOHKA ROAD , JUNWANI , DIST DURG . (Length = 1385.70 METER)
SPECIAL REPAIR OF CONSTRUCTION OF C.C ROAD AT AMORA TO ARJUNI ROAD LENGTH 0.80 KM UNDER SUB DIVISION NO.02 BALOD
CONSTRUCTION OF SIVANI APPROACH ROAD TOTAL ROAD LENGTH = .900KM I/C BRIDGE & CULVERT