Loading…
Loading…
822 results • Recent activity
Outsourcing of Labour Part for Replacement of low-lying PVC at road crossings with 4-core cables and re-locations of MCBs etc
Preventive, Breakdown AN Shutdown Maintenance of 220KV AN 66KV CANR Panels, DRs, SER, GPS, GRP, GCDP, Digital AVR , RTCC Panels, Protection System installed on 6.6kV AN 415V switchgear and other panels including meters installed in 4x210MW and Microh
Outsourcing of Labour Part for Erection Testing Commissioning of New 11KVLTHT Lines on RailPCC Poles, Distribution TFs Augmentation Sagging of ACSR of HTLT Lines Cables laying Guarding Stay Set for Various Works such as Releasing of TWell Connections
BREAKDOWN/ PREVENTIVE MTC. OF TG EQUIPMENTS and OVERHAULING OF ASSOCIATED AUXILLARIES OF 4X210 MW KWU DESIGN BHEL MAKE TG UNITS AT GGSSTP, RUPNAGAR.
Outsourcing of Labour Part for the pilot project to rectify low lying PVC cables at road street crossings for 2 no.ULB under Jalalabad Division , under DS Circle, Ferozepur.
Outsourcing of Labour Part for the pilot project to rectify low- lying PVC cables at road street crossings for 1 no.ULB under suburban Division , Mamdot SD, under DS Circle, Ferozepur.