Loading…
Loading…
370 results • Recent activity
Kumardoba-Monipur with in Simlapal Block (Road Length 11.672 km)
Balarampur-Ramboni with in Simlapal Block (Road Length 5.702 km)
L022 Pathardoba to Patamachia with in Simlapal Block (Road Length 8.400 km)
Construction of Strom water Drain Both Side (at ch 700m to 1120m) andNew 1000 mm dia HP Culvert (at ch 1740m) At Uchalan Eklakhi Road to Amar via Kendur within Khandaghosh -Block
Construction of Strom water Drain from at Chainage 0.02Km to 0.120KM(L/S),0.130 KM to 0.210 KM(R/S),0.640 TO 0.740KM(L/S),0.930 TO 1.028KM(L/S)and 2.100KM to 2.420KM (R/S) and Allied Work at Bramadanga to Gomai Road at Ketugram GP within Ketugram-II
Construction of Road from Saintara To Chhatina PMGSY Road within Kotulpur Block in the District of Bankura, Road Length 5.820 K.m.