Loading…
Loading…
370 results • Recent activity
Construction of Strom water Drain Both Side ( at ch 1100m to 1340m )and Cross Drainage 1000 mm dia HP Work ( At ch 1230m, 2110m) At Kasthakuramba to Samanti within Burdwan II -Block
Construction of Single Cell 2 M X 2M Box Culvert ( at ch 570m, 1340m, 4270m) and Strom water Drain Work both side(at ch 2430m to 2820m)At Hatgobindapur to Debagram within burdwan II-Block
Development of Junction where lower hierarchy road (VR/ODR) meets hierarchy road (NH/SH/MDR/ODR) on 18 nos Rural Road under different blocks WBSRDA, Purba Bardhaman Division in the District of Purba Bardhaman as per Road Safety Audit Norms (under Roa
Traffic Calming Measure for Road Safety on 18 nos Rural Roads within different blocks under WBSRDA, Purba Bardhaman Division in the District of Purba Bardhaman as per Road Safety Audit Norms (under Road Safety AAP 2024-25)
Repair, Maintenance of Road from Murundi PWD roads to Murundi Village under Ketugram-II Block. Total Length 1.360 K.M under State Fund
Restoration of Flood Damaged PMGSY Road from Senpara to Nabagram road under Ketugram-II Block