Loading…
Loading…
370 results • Recent activity
L031 Parisar to Gobindapur with in Sainthia Block Road Length 2.150 km and L032 Parisar to Gobindapur with in Sainthia Block Road Length 6.380 km Total Length 8.530 km Post 5 Years Package Number WB04MTN 017
L036 Rashikchak to Sahapur Road with in Illambazar Block Road Length 8.190 km Post 5 Years Package Number WB 04MTN 003
Jashodanandapur to Chatrawithin Onda Block. Length 6.700km
Construction of the road from Tripti Hotel to Saluka Village via Saharjora Ghosh Para within Barjora Block. Length 4.400 km
Construction and Installation of Faecal Sludge and Treatment Plant of 20 KLD capacity based on Enhanced Digestion and Multi-stage Bioreactor (EDMSB) technology at Labpur Block, Birbhum District
Construction and Installation of Faecal Sludge and Treatment Plant of 3 KLD capacity based on Bio Digester Aided Constructed Wetland (BAC) technology at Katwa-I Block, Purba Bardhaman