Loading…
Loading…
25 results • Latest
Necessary arrangement for cutting felling of 22 nos dead dry trees and 02 nos live trees along the Chanchal Kharba Churamanghat Road standing trees different chainages of ChanchalKharbaChuramanghat Road and
Installation of 4 nos speed calming measures at Habibpur block office and Aiho bridge with cautionary, informatory boards and both side embankment protection work by concrete block pitching near to Aiho bridge under GHSD under Malda Highway Division
Urgent cutting of uprooted trees, deceased trees standing dangerously due to monsoon all roads under jurisdiction of BHSD and removal of all debris including branches of trees and leaves etc from road surface and footpath and to dump in the nearest..
Natabari-Bhatibari Road-1.50 km to 3.50 km and Chilakhana-Natabari Road from 5.00 kmp to 9.80 km pre-monsoon potholes repair work under Cooch Behar Highway Division in the district of Cooch Behar.
Emergent potholes repairing of Chetra Chekapdera Bazar (13th Kmp of Dinhata Balarampur Road) to Nazirhat Bazar road via Balakura New Bazar in stretch from 0.00 to 4.05 km, under Cooch Behar Highway Division in the district of Cooch Behar.