Loading…
Loading…
54 results • Latest
Emergent Supply and deployment of one 80 MT capacity crane one 40ft low bed trailer and one Hydra crane for removal of an existing structure of approximately 60-70 ft height lowering the same safely loading transportation to a designated location
Consultancy Service for carrying out Falling Weight Deflectometer Test over Flexible Pavement, 7 Day Traffic Survey, Topographical Survey, Axle Load Spectrum Survey, Existing Road Crust profiling as per relevant IRC guidelines for Four (4) Nos of Roa
Construction of road side HP Drain including repairing of existing surface drain at Bishnupur in connection with Dumdum Lauhati near 10.20 Kmp under Barasat Highway Division No.-I in the District of North 24 Parganas.
Consultancy services for preparation of Detailed project Report in connection with the work of Ranihati Haridaspur Amta Road Four Lanning from 0.00 kmp to 3.5 Km. Strengthening of existing carriageway from 3.5 km to 16.70 km in the dist of Howrah
Badkulla-Kulgachi Road from 0.00 km to 4.00 km, Patch repairing and restoration work in different stretches under Krishnagar Highway Sub-Division No-II of Nadia Highway Division No-I in the district of Nadia during the year 2026-2027
Roof treatment with some allied works for the office of Krishnagar Highway Sub-Division No-I under Nadia Highway Division No-I in the district of Nadia during the year 2026-2027