Loading…
Loading…
319 results • Recent activity
Habra Ashokenagar Bye Pass Road from 0.00 km to 5.00 Km Surfacing work under Barasat Highway Division No.Il in the District of North 24-Parganas
Thakurnagar Ramchandrapur Via Sosadanga Road from Ch 0.00 Km to Ch 0.350 Km, Ch 1.90 Km to Ch 2.050 Km, Ch 2.40 Km to Ch 3.30Km, Ch 4.07 Km to Ch 4.17 Km, Strengthening by Inter Locking Concrete Block Pavement under Barasat Highway Division II, P.W.
Moyna Madhabpur Road Strengthening work with Interlocking Concrete Block Pavement at different stretches from 0.000 kmp to 1.100 kmp, 2.100 kmp to 2.500 kmp and 3.500 kmp to 4.500 kmp under Barasat Highway Division II in the District of North 24
Beliaghata Prithiba Road Strengthening work with Interlocking Concrete Block Pavement from 1.940 kmp to 3.745kmp under Barasat Highway Division II in the District of North 24 Parganas
Birnagar Aranghata Road from Ch. 0.00 Km to Ch.2.00 Km Strengthening Works Excluding mastic zone under Nadia Highway Division No II in the District of Nadia during the Year 2025-2026
Muragacha Kalyani Road from 0.00 Kmp to 3.30 Kmp Excluding Mastic Zone and both side Service Road Surfacing work under Nadia Highway Division No.- II, P.W.Roads Dte. in the District of Nadia during the year 2025-2026