Loading…
Loading…
329 results • Recent activity
Restoration in patches to Madartala Choyani Bazar to Gopalpur Bazar via Lebutala from 3.80 Km. to 6.40 Km. under Barasat Highway Division I in the district of North 24 Parganas.
Restoration of road in Patches including protective work damaged in streches from chainage 0.00 Kmp.to 5.00 Km. of Haroa Autostand - Natunhat Road under Barasat Highway Division-I in the district of North 24 Parganas.
Restoration work of road damaged due to laying of 3X 300 Sqmm XLPE UG 11KV cable line for supply of electricity at Project Rajotto by WBSEDCL from chainage 2.50 Km.to 3.60 Km. at left side flank by HDD method of Eco Park - Kalur More Road under Baras
Berachampa - Baduria Road from chainage 10.60 Km. to 11.20 Km, Permanent restoration of Damaged/ to be damaged road due to laying of water supply Pipe-Line as proposed by Barasat Division, MED under AMRUT 2.0 under Barasat Highway Division I in th
Restoration Works on Black Top Surface and Hard Shoulder to be damaged due to laying Pipe Line as proposed by North 24 Parganas, M.E. Dte. along Taki-Murarisha-Bhebia-Chaital Road from chainage 0.00 Kmp. to chainage 0.400 Km. under Barasat Highway
Dhubulia Belpukur Road from 0.10 kmp to 2.0 kmp and from 4.00 kmp to 4.50 kmp Emergent Patch repairing work under Krishnagar Highway Sub Division No.-I under Nadia Highway Division No.-I in the District of Nadia during the year 2025-2026.