Loading…
Loading…
92 results • Latest
Topographical Survey using ATS Machine Conducting Geotechnical Investigations, FWD Test and axle load survey for evaluating overlay requirement of Saptagram Tribeni Kalna Katawa Road S.T.K.K. SH-6 from 0.460 kmp to 1.833 kmp and 3.4
Preparation of Detailed Project Report DPR for the work G.T Road SH-13 for the Work of Widening from 605.60 km to 606.05 and 611.70 km to 612.30 km Strengthening from 597.335 km to 605.60 km and 606.05 km to 611.60 km under Hooghly Highway Di
Link Road from Majdia-Akandapur Road from 0.06 km to 0.16 km and 3.00 km to 4.30 km emergent repairing and maintenance of Road Surface under Kalna Highway Sub Division of Burdwan South Highway Division, P.W.(Roads) Dte
Kulti Haritala to Jamna Bus stand via Krishnapur, Baharkuli, Sargoria Road from 1.00 km to 4.50 km and 7.00 km to 8.80 km (in stretches) emergent maintenance repairing work of Kalna Highway Sub Division under Burdwan South Highway Division.
Chagram Dhankol to Patharghata Panchayet Office via Choto Baharkuli, Sadhupatty Road from 2.0 km to 5.0 km (in stretches) emergent surface repairing work under Kalna Highway Sub Division of Burdwan South Highway Division, P.W.(Roads) Dte
Rathtala Osmanpur Village Road from 1.00 km to 5.00 km emergent repairing and maintenance of Road Surface under Kalna Highway Sub Division of Burdwan South Highway Division, P.W.(Roads) Dte in the district of Purba Bardhaman during the year 2026-2027