Loading…
Loading…
435 results • Recent activity
Egra Bajkul road from 25.00 km to 26.00 km, 28.00 km to 30.00 km, 33.50 km to 34.00 km and 36.00 km to 37.00 km, temporary patch repairing work by patching potholes, repairing potholes, 20 mm PC and SC in stretches under Tamluk Highway Division in th
Recovery and Restoration of Saiya Pawnan Road (VR) from 0.00 km. to 3.30 Kmunder Hooghly Highway Division No. I in the District of Hooghly during the year 2025-26 (under SDRF).
Engagement of 1 (one) no. Motor Cab (Commercial Luxury Taxi) of current model minimum Mass Emission Standard Bharat Stage -IV, with Diesel Engine for the office use of the A.E, MHSD, P.W. (Roads) Directorate
Recovery and Restoration of Santipur Anupnagar Metal Road from Ch. 0.250 km. to Ch. 1.663 km. under Hooghly Highway Division No. I, P. W. (Roads) Directorate (under SDRF)
1) Emergent repairing and maintenance of damaged road surface of Arambagh Goghat Ramjibanpur Road (in stretches effectively 6.45 km) with WMM, Profile Corrective course, MSS etc., under Arambagh Highway Sub Divn of Hooghly Highway Divn I, P.W.Roads
Emergent Repairing work with ICB and WMM in different stretches (effectively 0.385km) of Arambagh Goghat Ramjibanpur Road(SH-7) under Arambagh Highway Sub Division under Hooghly Highway Division No-I, P.W.(Roads)Directorate