Loading…
Loading…
446 results • Recent activity
Recovery and restoration of Nalikul Seakhala Road from 0.230 Kmp. to 6.18 Km under Hooghly Highway Division No.- I in the District of Hooghly during the year 2025-26.
Recovery and restoration work of Mogra - Polba Road (MDR) from 0.56 Km to 8.65 Km under Hooghly Highway Division No.- I in the District of Hooghly during the year 2025-26.
Rehabilitation work of 4nos. distr. bridges over Baidyabaticanal at Ch.12.670km, over Ghungircanal at Ch.14.260km, over Saraswaticanal at Ch.21.470km and over Gheakunticanal at Ch.34.284km of newly taken over Delhi road (SH-13)under HHD2 during 24-25
Repair and Renovation of Nalhati Bungalow under Rampurhat Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum during the year 2025-26
Egra Bye Pass Road from 0.00Km to 0.500Km temporary patch repairing work by repairing potholes 20mm PC and Seal Coat in stretches under Tamluk Highway Division in the district of Purba Medinipur
Construction of Storm Water Surface Drain beside the Rajgram Mohanpur Road at Ch 3.00km to 3.35km under Rampurhat Highway Sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26 (under SDMF Scheme).