Loading…
Loading…
672 results • Recent activity
Curtain wall, floor appron and boulder protection work at the upstream side of culvert at 4th kmp of Giladanga Keshoribari road under Cooch Behar Highway Division in the district of Cooch Behar.
Anandapur (Ruby) to Natunhat Road Via Khardah - Boynala -Pratapnagar-Harapur Road, Emergent flank damage repairing work from 7.00 Kmp to 15.00 Kmp in different Stretches (protective Work) under South 24 Paraganas Highway Division.
Julpia Chakdahhat Road from 0.00 kmp to 8.00kmp Except existing Mastic portion 838.00m and PHE restoration area, Emergent patch repairing work under South 24-Parganas Highway Division in the Dist of South 24-Parganas.
Rectification work by potholes repairing and surfacing work against the project of Baishnabnagar Jaldahi Road from 0.00 km to 4.80 km Surfacing work and 1.410 km Paver Block In stretches, under Malda Highway Division, in the District of Malda.
Kolkata-Basanti road from 45.00kmp to 49.00 kmp , 55.00 kmp to 57.00 kmp, flank damage restoration and allied work under South 24 Parganas Highway Division in the District of North 24 Pgs.
Kanthalberia Hotor Road, from 0.00 Kmp to 2.35Km (except existing PHE restoration area) Emergent patch repairing work under South 24 Parganas Highway Division in the District of South 24 Parganas.