Loading…
Loading…
6,332 results • Latest
Handrails-IS:4912 (Q3) (3 (3 ))
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2), Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4) ( ( 3 3 ))
Metal Beds (V3) (Q2), Modular Table/Meeting Table Centre Table (V2) (Q2), Chair for General Purpose (Q2), Metal Storage Cabinet (Q2), Revolving Chair (V5) (Q2), Sofa (V3) (Q2), Executive Table (V4) (Q2), Bed Mattress Conforming to IS 13489 (V3) (Q2) (3 (3 ))
SITC of 33/0.4 KV Outdoor Substation (Equipment), LT Cable, Hume Pipe, MV panels, area lighting, earthing works, Pumps, Lightning Arrestor, ELV works & Air Conditioner works in Integrated Sports Complex, Raigarh (C.G.)
CONSTRUCTION OF100 SEATER BOYS HOSTEL BUILDING FOR PVTG STUDENTS I/c ELECTRIFICATION, WATER SUPPLY, SANITARY FITTING AT GURIYA DISTT. NARAYANPUR (without escalation and bonus)
CONSTRUCTION OF SALDIH BAHADURPUR ROAD(MDR NO. 340),LENGTH 6.50 K.M. ,I/C. CULVERTS AT DIST. MAHASAMUND.(MAHASAMUND DN.).