Loading…
Loading…
847 results • Recent activity
Slope stabilisation work to protect landslide at chainage 19.550 Km, 22.15 Km and 22.750 Km of NH 717(A) at Pedong Bazar to Lingsay (Rhenock at Sikkim Border via Kagay) Road under Kalimpong Division, P. W.D.
Construction of drain on the hill side slope along the road from 27.000 kmp to 29.700 kmp of Upper Rishi Road under Kalimpong Division, PWD in the District of Kalimpong.
Recovery and Reconstruction of Road and Drain from 0.00 km to 1.00 km of Reyan Road for mending damaged occurred due to heavy rainfall from 04.10.25 to 05.10.2025, under Kalimpong Division PWD in the district of Kalimpong
Recovery work to the road from 27.30 km to 28.00 km, 28.20 km to 28.60 km and 29.00 to 29.10 km of Teesta Valley Road for mending of damaged Occurred due to heavy rainfall during the period from 04.10.2025 to 05.10.2025 under Kalimpong Division PWD
Construction of Protection Wall at 10.42 Km of 12th Mile to Nimbong Fatak Road Under Kalimpong Division, PWD.
Construction of Plum wall at Chainage 4.60 km of Relli to Deorali Road, Kalimpong Division, P.W.D.