Loading…
Loading…
1,06,662 results • Latest
PR of PWD Black top road from (i) T.K road (near Trishabari) to Khamarbari road (L-1.60 km), (ii) A.A. Road to DM Colony road (L-1.30 km), (iii) GM Road to Gopi Vallab School road (L-1.50 km) and (iv) GM Road to approach road of Fulbashi School (L-0
C.M.S Doctors Quarter Building - Repair work to Outside surface of the building and Staircase from ground floor to 1st floor, Kolkata during the year 2025-26.
Construction of Protective wall and other allied works at DMDC quarter at Kalimpong in the district of Kalimpong.
SPECIAL STRENGTHENING WORK FOR KAMADPUR PIPLIYA ROAD TOTAL LENGTH 4.10 KM ( Second Call )
1st Call Horizontal extension of Administrative building (back side) attached with Treasury building in Ground floor for Additional toilet at Administrative building at Basirhat, North 24 Parganas of 2026-2027.
Renewal of Chauri-Tikra-Samdhi-Mavaiya to Deviganj Subeha road(ODR) in km-5, 6, 7, 8, 9