Loading…
Loading…
423 results • Latest
BT Patch Repair, BT Renewal, Damage Culvert and Other Maintenance work while the contractor is not carrying out the work under performance Gaurantee for year 2026-27 under Section Shadora PWD Sub Division Ashoknagar
Repair and Maintenance work of Wajidpur Shadora Naisaray Myana CC Road Total Length- 59.00 Km in Chainage - 00.00 Km to 20.00Km under PWD Sub Division Ashoknagar MP
BT Patch Repair, BT Renewal, Damage Culvert and Other Maintenance work while the contractor is not carrying out the work under performance Gaurantee for year 2026-27 under Section Eshagarh PWD Sub Division Ashoknagar
Strengthening work of Rajna Approach Road Length 2.20 Km. Including electrification work.(IInd-Call)
Strengthening work of Navegaon Station Approach Road Length 0.80 Km with electrification work. And Karmohni bandi Approach Road Length 0.80 Km. Total Length 1.60 Km. (IInd-Call)
S/R of Installation and Fixing Camera to Rest House Ujjain District Ujjain.
Strengthening work of Bhandi To Jhotkalan Road Length 7.00 Km Proposed Length 2.00 Km (IInd-Call)
Bolero Vehicle (Model 2024 and Above) - Hire Vehicle for the year 2026-27 inspection of Govt. construction work Per Month P.W.D. (EandM) Division Ujjain.
E/I work Under Zonal Contract for year 2026-2027 of PWD (E/M) Division Ujjain (E/M) Under Sub-Division Ratlam (Ratlam Section) A.R. / S.R/ MOW/ Deposit work Etc. for Government Buildings. (As per requirement, Any work of (E/M) Division Ujjain can
Bolero Vehicle (Model 2024 and Above) - Hire Vehicle for the year 2026-27 inspection of Govt. construction work for 15-15 days Per Month Under Sub-Divisional Officer P.W.D. (EandM) Sub-Division Ujjain and Assistant Engineer P.W.D. (EandM) Division
Strengthening of Jhara to Keet Road Length 0.80 km. and Kurran Tola Approach Road Length 1.80 km. Total Length 2.60 km.
Strengthening of Chhapra Tola to Mahua Tola Road Length 2.60 km.
Strengthening of Semari Tola Approach Road Length 1.50 k.m. and Chitrasi Nai Basti to Gondahi Tola Road Length 2.00 km. Total Length 3.50 km.
Strengthening of Khannaudhi to Udyapur Ratahar Road Length 4.70 km.
Strengthening of Mantoliya Main Road to Majhauli Road Length 3.00 km.
Strengthening of Bhanpur Kathautiya Hardi Samatpur Road Length 2.80 km.
Strengthening of Majhgawan (Majhganw) to Baigan Tola Road Length 3.00 k.m.
Strengthening of Charkhari Approach Road Length 2.10 k.m. and Devgaon Approach Road Length 1.40 km Total Length 3.50 km.
Strengthening of Mohani to Shaktidol (Shaktitola) Road Length 3.00 k.m.
Strengthening of Bhursi Mantoliya Main Road to Majhauli Road Length 3.00 k.m.
Strengthening of Kanadikala to Tetka Road Length 3.00 k.m.
STRENGTHENING WORK OF TAKLI TO BADGAON ROAD LENGTH 1.40 KM.
Strengthening of Nawa tola to Harijan Tola Chhattisgarh Road Length 2.40 k.m.
Strengthening of Biraudi to Bharaua Road Length 4.50 k.m.
Construction of Rosheshwar to Atarsambha Road Length 3.50 Km. i/c Electric Pole Shifting
STRENGTHENING WORK OF VARLA TO BAKHARLI ROAD LENGTH 5.80 KM.
STRENGTHENING WORK OF HINGHWA VARLA ROAD LENGTH 4.97 KM.
STRENGTHENING WORK OF ANJAD TO BARDA ROAD LENGTH 5.00 KM.
STRENGTHENING WORK OF HINGHWA APPROACH ROAD LENGTH 3.00 KM.
STRENGTHENING WORK OF PANSEMAL TAKLI ROAD LENGTH 1.30 KM.
STRENGTHENING WORK OF DAWANA TO CHICHLI AND MANDWADA APPROACH ROAD LENGTH 4.63 KM.
STRENGTHENING WORK OF PADACHA APPROACH ROAD LENGTH 5.00 KM.
Strengthening of Saristal to Kubara Road Length 2.90 k.m.
STRENGTHENING WORK OF KHETIYA ROKHADIYA HANUMAN ROAD LENGTH 1.60 KM.
STRENGTHENING WORK OF DAWANA BRAHMANGAON ROAD LENGTH 4.58 KM.
STRENGTHENING OF NIMTHAL APPROACH ROAD, KHANDWA DAHOD ROAD, BADGYAR TO LUNHERA ROAD and DELMI JALWAI ROAD TOTAL LENGTH 4.60 K.M.
Plaster repairing, Putty and emulsion paint work of officers bungalows at civil line, Jabalpur.
Plaster repairing, Putty and emulsion paint work of Justice bungalows at Civil line Jabalpur.
SPECIAL STRENGTHENING OF DONDAKI TO NAGAURA ROAD LENGTH 5.40 KM, UNDER PWD SUB DIVISION DEOSAR DISTT- SINGRAULI (M.P.)
SPECIAL STRENGTHENING OF PURAIL CHHANDA TO DEVARA RAILWAY STATION ROAD LENGTH 6.00 KM, UNDER PWD SUB DIVISION DEOSAR DISTT- SINGRAULI (M.P.)
CONSTRUCTION OF HARDI PATTA GODAM TO GOPAD PUL GOTARA APPROACH ROAD LENGTH 3.24 KM. UNDER SUB DIVISION DEOSAR , DISTT- SINGRAULI (M.P.)
STRENGTHENING OF DHAURAHAWA TO SIRGUDI APPROACH ROAD LENGTH 3.80 KM. UNDER SUB. DIVISION CHITRANGI- DISTT. SINGRAULI (M.P.)
STRENGTHENING OF KHANUAKHAS AADIWASI BASTI APPROACH ROAD LENGTH 3.00 KM. BLOCK WAIDHAN, DISTTI- SINGRAULI (M.P.)
STRENGTHENING OF GORBI BASTI APPROACH ROAD LENGTH 3.70 KM. UNDER SUB. DIVISION CHITRANGI DISTT. SINGRAULI (M.P.)
STRENGTHENING OF JHARA RAILWAY STATION TO JHARA AADIWASI BASTI ROAD LENGTH 3.00 KM. UNDER PWD SUB DN. DEOSAR DISTT- SINGRAULI (M.P.)
STRENGTHENING OF SAJAWAR TO DONGARI ROAD LENGTH 3.70 KM. BLOCK WAIDHAN, DISTTI- SINGRAULI (M.P.)
ANNUAL REPAIRING AND OTHER MAINTINANCE WORK RESIDENCIAL BUILDING AT UNDER JAIL SECTION SPECIAL WORK SUB DIVISION GWALIOR
ANNUAL REPAIRING AND OTHER MAINTINANCE WORK RESIDENCIAL BUILDING AT UNDER H.Q. SECTION DABRA SUB DIVISION DABRA
ANNUAL REPAIRING AND OTHER MAINTINANCE WORK RESIDENCIAL BUILDING AT UNDER KAPOO-1 AND KAMPOO-2 SECTION SPECIAL WORK SUB DIVISION GWALIOR
ANNUAL REPAIRING AND OTHER MAINTINANCE WORK RESIDENCIAL BUILDING AT UNDER BHITARWAR SECTION DABRA SUB DIVISION DABRA