Loading…
Loading…
4,114 results • Latest
Water Proofing Treatment and Deposit work of Residential and Non Residential Building Under H.Q. Sub Division Damoh
Maintanance/colour washing/MOW/Deposit work of Residential Building Under H.Q. Sub Division Part 3
B.T. RENEWAL WORK IN DIFFERENT ROADS UNDER P.W.D SUB DIVISION KHURAI LANGTH 14.90 KM PAC 336.65 LAKH (GROUP-II) III - CALL 1. BADE THAKUR BABA TO CHHOTE THAKUR BABA MAGRA TO CHANDRAPUR ROAD LENGTH 7.00 KM PAC 148.67 LAKH 2.TALAPAR TO DUGAHA KALAN
Maintance/Colour Washing/MOW/Deposit Work of Residential Building and Non Residential Building Under Road Sub Duvision Damoh
Repair work of various Road under Road Sub Division Damoh
Repair Work of Various Road Under Tendukheda Sub Division.
Maintanance /Colour Washing/MOW and Deposit Work of Non Residential Building Under Tendukheda Sub Division.
Repair Work of Various Road Under Hatta Sub Division.
Maintance/Colour Washing/Mow and Deposit Work of Residential Building Under Tendukheda Sub Division
Repair Work of Culvert on Various Road Under Tendukheda Sub Division.
Maintanance/Colour washing/MOW/Deposit work of Residential Building Under H.Q. Sub Division Damoh
Repair work of Culvert of Various Road under Road Sub Division Damoh
Maintanance /colour washing/MOW/Deposit work of Rasidential Building Under H.Q.Sub Division Damoh
Maintenance Special repair and other deposit work of Govt. Building Under P.W.D. Sub Division No I Distt. Chhindwara. (Ist-Call)
Construction of Temporary Helipads and approach roads, shifting and fixing of barricades in view of VVIP and other programmes under PWD sub division Manawar.
Construction of Additional room for study at govt. Higher secondary school of Excellence No.1 Dhar.
Construction of Toilet for Transgender at Civil court Campus Dhar
Pot hole filling with Pressure Sensitive Technology (PST) under P.W.D. Division Datia
Maintenance work of Judicial Residential building and Court campus Repairing work Sub Division Datia
Inspection Vehical on rent for P.W.D. Division Datia
Maintenance work of Residential building and other work under Sub Division Datia
Construction of new septic tank, sewer line from different bathrooms, construction of damaged boundary wall at different location of JEC section, Jabalpur.
BT Renewal Work on Char Imli Internal Road Length 10.00 Km.under Survey Sub Division Bhopal.
Renewal of Kala Darwaja to Babe Ali Benejer Ground Purana DPI Office Lokayukt Office Old Sachivalaya Internal Road Length 3.90 Km., Renewal of Nadra Bus Stand to Chhola Road Length 1.90 Km. and Renewal of Food and Drug Store Bunglow and T.B. Hospit
Construction of Boundary Wall, Construction of One Guard Room and Construction of Two Watch Towar, Milatary Area Mubarakpur Bhopal
CONSTRUCTION OF WHITE TOPPING WORK AT CITY LINK ROAD SAGAR INCLUDING ELECTRIFICATION WORK (TOTAL LENGTH - 3.20 KM) PAC 1060.28 LAKH
WMM/BT Patch repair work on Various road Under PWD Sub Division Rajgarh and Narsinghgarh 2nd Call
Central Lighting at Shivana River Bridge Mandsaur District Mandsaur.
NIT SCHEDULE FOR REPAIRING OF THANA BHAWAN CHANDIYA DISTRICT UMARIA
Maintenance Special repair and other deposit work of Govt. Building Under P.W.D. Sub Division No II Distt. Chhindwara. (Ist-Call)
Maintenance Special repair and other deposit work of Govt. Building. At Bichhua Mohkhed And Chourai Section Under P.W.D. Sub Division No II Distt. Chhindwara. (Ist-Call)
B.T. Patch Repair work on Various Road Under Sub Division Nepanagar
B.T.Patch Repair work on Various Road Under Sub Division Burhanpur
B.T. and W.M.M. Patch Work of Various Road Under Sub Division Budni No 02
Repair of Culverts, Retaining Walls and RCC Drains on Various Roads under PWD Sub Division Budni No 02 Dn. Budni Distt. Sehore (M.P.)
Construction of Helipad and Barricating work for VIP Management under Sub Division No. 01 Dn. Budni
Construction of Shed, Platform and Boundary wall near Gupteshwar (Kailashpuri) and Durga Mandir (Avadhpuri, Gwarighat), Jabalpur.
B.T. Renuwal Work On Khabada to Dobi Road Length 3.00 Km, Dobi- Khoha Road to Satramau Road Length 2.30 Km, Amon to Sagpur Road Length 1.50 Km. and Dobi to Hathnora Road Length 3.00 Km
Water Proofing Treatment on roof of Mahalaxmi Parisar Remaining Govt. Resi. Qtrs. under RTC Sub Dn, PWD Bhopal
Water Proofing Treatment work of Jail Section under Jail-3 Sub Division, PWD Bhopal
BT Patch Repair and Other work under M-3 Sub Division, PWD Bhopal
Water Proofing Treatment work including necessary repair of Govt. Resi. Qtrs. in Sect. No. 7A and other under M-1 Sub Division, PWD Bhopal
Water Proofing Treatment work including necessary repair of Govt. Resi. Qtrs. in Sect. No. 5 and other under M-1 Sub Division, PWD Bhopal
Water Proofing Treatment work including necessary repair of Govt. Resi. Qtrs. in Sect. No. 4 and other under M-1 Sub Division, PWD Bhopal
Water Proofing Treatment work including necessary repair of Govt. Resi. Qtrs. in Sect. No. 1 and other under M-1 Sub Division, PWD Bhopal
Water Proofing Treatment work of Govt. Resi. Qtrs. in Sect. No. 25 under Jail-3 Sub Division, PWD Bhopal
Patch repair and Work of Cement Concrete shoulders, drain, central verge, footpath, pavaer block, renovation of rotary and repair of other work of Main road No. 2 under M-3 Sub Division, PWD Bhopal
Patch repair and Work of Cement Concrete shoulders, drain, central verge, footpath, pavaer block, renovation of rotary and repair of other work of Main road No. 3 under M-3 Sub Division, PWD Bhopal
AR/SR/Anurakshan and Diposit Work of various Govt. Resi. Qtrs. in Section No. 9 under M-2 Sub Division, PWD Bhopal
SHIFTING OF 11KV / LT LINES AND DTRS DUE TO CONSTRUCTION OF RAILWAY OVER BRIDGE AT GATE NO. (257) FROM GADARWARA TO BARAHABADA ROAD TEHSIL GADARWARA, DISTT NARSINGHPUR (M.P.)