Loading…
Loading…
4,112 results • Latest
REPAIR AND MAINTENANCE OF ROAD AND CD S UNDER AGRA SECTION UNDER DISTRICT SUB DIVISION SUB DIVISION NO. 2 INDORE
REPAIR AND MAINTENANCE OF BUILDINGS UNDER SANWER SECTION UNDER SPECIAL WORK SUB DIVISION INDORE
DRR (DIESEL ROAD ROLLER) (JESSOP/1978) (SDO B/R SUB DIV.NO 1 BALAGHAT) REG. NO. 8096
REPAIR AND MAINTENANCE OF ROAD AND CD S UNDER SANWER SECTION UNDER SPECIAL WORK SUB DIVISION INDORE
BOLERO NEO OR EQUIVALENT VEHICLE FOR INSPECTION OF GOVT. WORK TO SUB DIVISIONAL OFFICER PWD BRIDGE SUB DIVISION MANDLA. (For 2 Year))
REPAIR AND MAINTENANCE OF ROAD AND CD S UNDER DEPALPUR SECTION UNDER DISTRICT SUB DIVISION SUB DIVISION NO. 2 INDORE
REPAIR AND MAINTENANCE BUILDINGS UNDER DEPALPUR SECTION UNDER DISTRICT SUB DIVISION SUB DIVISION NO. 2 INDORE
REPAIR AND MAINTENANCE OF ROAD AND CD S UNDER HATOD SECTION UNDER DISTRICT SUB DIVISION SUB DIVISION NO. 2 INDORE
REPAIR AND MAINTENANCE OF ROAD AND CD S UNDER KSHIPRA SECTION UNDER SPECIAL WORK SUB DIVISION INDORE
REPAIR AND MAINTENANCE OF BUILDINGS UNDER HATOD SECTION UNDER DISTRICT SUB DIVISION SUB DIVISION NO. 2 INDORE
Construction of Balance Work Chirahkala Koudiya Road Length 2.30 Km. Under Sub Division Gadarwara. (2nd Call)
REPAIR AND MAINTENANCE OF NR OFFICE BUILDING PWD DIVISION NO. 2 INDORE
RENOVATION AND RETROFITTING WORK OF NON RESIDENTIAL BUILDING AT DEPALPUR SECTION UNDER DIST SUB DIVISION NO. 2 INDORE
Construction of High Level Bridge Across Hallon River in Km. 11 6 of Balpur to Dhanora Road District Seoni
Annual Repair work for the years 2026-27 under PWD bridge constsruction sub division khandwa Distt. Burhanpur
Annual Repair Work for the years 2026-27 under PWD Bridge Construction Sub Division Khandwa Distt. Khandwa.
Reparing of Flat No. 4 and other works in Condominium building at MPHC Jabalpur and water proofing treatment in MPHC building, Jabalpur (Club House)
Wall paper, water proofing treatment, drainage sewer line work and other work in Residential bungalows under HQ section under HQ sub division No. 3, Jabalpur.
W/W C/W TO GOVT RESIDENTIAL NON RESIDENTIAL BUILDING UNDER HARSUD SUB DIVISION KHANDWA
W/W C/W TO GOVT RESIDENTIAL NON RESIDENTIAL BUILDING UNDER KHANDWA SUB DIVISION KHANDWA
Maintenance and reparing work in Residential bungalow under HQ section at Jabalpur under HQ sub division No. 3, at Jabalpur.
Shifting of HT/LT Lines, Pole Creating Obstackles in Construction of High Level Bridge on Satsovi River at Dhangaon to Baidiya Road Distt. Khandwa.
BARRICADING WORK FOR SHRAAWAN MAAS SAWARI-2026 AT DIVISION UJJAIN.
Miscellaneous repair work of Chajjas, Sewer line etc. in Highrise Govt. Qtrs. Under PWD (B/R), Sub division NO. 1, Jabalpur.
White washing Coour Washing and Repairing work at Tehsil Court Building Kotma Under Sub Division Anuppur
Providing Electrification work M.O.W., S.R. and Deposite work in Residential Building Under P.W.D. B/R Division Anuppur
Construction of B.T. road from Dhumma vkJe to Kabeer chabutra road Length 0.30 Km and Dhumma Ashram to Kalyan Seva Ashram road Length 0.70Km
ZONAL CONTRACT FOR MAINTANANCE OF PWD ROADS UNDER SUB-DIVISIONS OF MANASA DIVISION NEEMUCH
Special Strengthening of Road from Kajlikheda to Kolar Dam Length 16.90 Km. (Working Length 9.850 Km.) and BT Renewal Work on Kajlikheda to Kolar Dam Length 16.90 Km. Working Length 7.05 Km.) PAC Rs. 621.56 lacs First Call on
Construction of C.C. Road From Dronachal Sultania Infantry to Sanjeev Nagar Under Pass Road Length 3.550 Km. PAC 954.45 Lacs Second call on Road and Bridge S.O.R. wef 11-04-25 Work Period 365 days i/c rainy season
Special Strengthing of Construction of Asharam Bapu Chouraha to Acharpura Bhopal Length-2.55 K.M. an Renewal of AsharamBapu Choraha to Acharpura Road, Bhopal Length-4.75 K.M. PAC RS. 610.28 LACS First call on on Road and Bridge S.O.R. wef 11-04-25
Construction of Karond to Palasi Bhopal Length-3.00 K.M and Karond to Badwai Bhopal Length-0.30 K.M. PAC RS. 596.76 LACS First call on on Road and Bridge S.O.R. wef 11-04-25 Work Period 365 days i/c rainy season
PATCH REPAIR AND CD REPAIR WORK HQ SECTION MANPUR SECTION DR. AMBEDKAR NAGAR MHOW
VARIOUS PERFORMANCE GUARANTEE ROADS AT SIMROL SECTION DR. AMBEDKAR NAGAR MHOW
Strengthening Of Garoth City Approach Road Length 1.30 km Sub Division Garoth Division Mandsaur
REPAIR AND MAINTENANCE OF VARIOUS DAMAGED CROSS DRAIN ( CDs ) UNDER INDORE KHAJRANA SECTION PWD SUB DIVISION HQ 2, INDORE
CD REPAIR WORKS AND SIGN BOARDS ON VARIOUS ROADS UNDER KHAJRANA SECTION INDORE
UNSERVICEBLE MATERIAL (PLANT MACHINARY DINDORI)
Construction of Puwarda Happ To Hatuniya Road Length 05.50km. i/c Electric Pole Shifting Work. (Second called)
Construction of Two Lane Road From Chandrawatiganj To Chittoda Via Potlod Khedi Balgara Dayakheda Road Length 16.20km. i/c Electric Pole Shifting Work.
Construction of Submersible Bridge Including Approach Road Across Hiran River on Hirapur Jugpura Road District Narsinghpur.
Construction of Submersible Bridge Including Approach Road Across Hiran River on Bankhedi-Kakretha Road in District Jabalpur
Providing Electrification Work at Office Cum Bungalow JE1 at Residency Area Indore.
Supply and Installation of AC, Desert Cooler and LED Colour Display at AG Office at High Court Indore.
Electrification Work of Existing Second Floor of AG Office at MP High Court Indore.
Electrification work of A/R, S/R, Original Work / MOW / Renovation / Deposit work of Residential / Non Residential Buildings at PSC Section E/M Sub-Division Indore.
Annual Maint of 2 Nos Lift G2 for 8 Persons at MPPSC Office Indore.
Annual Comprehensive Maint. of Compact Sub Station and 160 KVA DG Set Installed at MPPSC Office Indore.
Electrification Work for Electrical Safety Report Compliance at MAHSI Building and MAHSI Girls Hostel Indore.
Electrification Work of Proposed Shade at Second Floor of AG Office at High Court Indore.