Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
4,390 results • Latest
Preparation of Detail Project Report of Ring Road at Pathariya Under Road Sub Division Damoh
B.T. Renewal work on Karariya Shamshabad road km. 19 to Kashipur Bawdi road length 3.00 km. IIIrd Call.
Special Strengthening work of Sitadongri Bamhani Chhindi Jogimuar Ghatamali Junadhana Kohka Damua Dhamaniya Marakadhana Khareti Khulsaan Bagbardhiya Jhurre (T.Prop.L.21Km) (IInd-Call)
Strengthening work of Datlawadi To Sarekhadhana Road. Length 1.00 Km with electrification work. And Nandora Approach Road 1.20 Km. Total Length 2.20 Km (Ist-Call)
Strengthening work of Ankhawadi Pagara Jamunbarra Lonapathar Kohka Damua Road. Length 5.00 Km (Ist-Call)
Strengthening work of Jatlapur Approach Road Length 1.30 Km. And Chhindwara Narsinghpur NH-547 To Jamuniya Mahadev Mela Road Length 4.10 Km. Total Length 5.40 Km. (Ist-Call)
Strengthening work of Gopalpur Amaboh Road Length 1.00 Km And Loniyamaru to Bilwa Road Length 3.40 Km.Total Length 4.40 Km (Ist-Call)
Finishing Work/Painting works in various RB/NRB under Section No.2, Jail Sub Division No.2, Bhopal
Water proofing Treatment work in various RB under SectionNo-2 Jail Sub Division No.2, Bhopal
Barricating for Law and order Situation at Various Places Under Jail Sub Division No.2 Bhopal
AR/SR Works in Various RB Under Section No.1, Jail Sub Division No.2, Bhopal
Water proofing Treatment work in various RB under SectionNo-2 Jail Sub Division No.2, Bhopal
AR/SR Works in Various RB Under Section No.2, Jail Sub Division No.2, Bhopal
Change of sanitary line and Septic Tank work of VIP Bungalows at Pachpedhi section, Jabalpur.
Strengthening of Road From Babadiya Kala Railway Fatak to Babadiya Village Length-1.50 K.M.
Finishing Work/Painting works in various RB/NRB under Section No.1, Jail Sub Division No.2, Bhopal
AR/SR/MOW and Deposit work of govt. Residencial buildings (F and Below Type) under sub division Dhar
AR/SR Deposit work of govt. Residencial buildings under sub division Badnawar
AR/SR/MOW And Deposit work of govt. Non Residencial Building under sub division Dhar, Badnawar, Manawar, Kukshi, Sardarpur under division Dhar
AR/SR Deposit work of govt. Residencial buildings under sub division Kukshi
AR/SR Deposit work of govt. Non Residencial (PWD) buildings under sub division Kukshi
Repairing Maintenance Work of Water Proofing work of various lift at Atal Bihari Vajpai Govt. Medical College Vidisha. IInd Call
White Washing, Colour Washing and Other work of Residential and Non Residential Govt. Building in Lateri Section under PWD Sub Dn. Sironj.
White Washing, Colour Washing and Other work of Residential and Non Residential Govt. Building in Sironj Section under PWD Sub Dn. Sironj.
Special Repair Work Boundary Wall P.W.D. Store District Morena
Repairing and Maintenance Work All Rest Houses And Annexe Buildings P.W.D. Division Morena
Repairing and Maintenance Work R.B. And N.R.B. Buildings P.W.D. Sub.Division Morena
Repairing and Maintenance Work Above F Type Category Quarters P.W.D. Division Morena
Repairing Work Of Quarter No. D-04 Judges Colony Morena
Repairing Work Of Quarter No. F-01 Officer Colony Morena
Construction of Baroda-Bharota-Talgaon to Badagaon Road Length 3.50 Km. Under Hatta Sub Division With Electrification ( II - Call )
CONSTRUCTION OF BOUNDRY WALL AT SDOP OFFICE AND RESIDENCE BUILDING CHITRANGI BLOCK CHITRANGI, DISTT- SINGRAULI (M.P.)
Construction of Sagoni Tikariya Road Length- 5.60 km. (including Pole Shifting)
Strengthening of Kirrod Bina Agasod Road to Kirrawada Bina Kurwai Road) Bypass Road Total Length 5.40 Km PAC Rs 571.86 Lacs
Construction Work Of Mukhiya Ka Pura (Nayakpura) To Pachokhara Road Length 3.50 Km.
CONSTRUCTION OF PAMAKHEDI TO SAIKHEDA ROAD LENGTH- 6.60 KM WITHELECTRIFICATION WORKS PAC RS- 662.57 LAKHS
Construction Work Of Tentra Road To Mewda Har Ganpati Ka Pura Hote Huye Raghunath Ghuraiya Ka Pura To Hansai Road Length 4.00 Km.
Construction Work Of Gram Panchayat Rancholi Mukhya Marg To Khatane Ka Pura Road Length 1.70 Km.
Construction Work Of Gram Mata Ka Pura To Gram Bhuapura Nahar Ke Kinare Main Road Tak Road Length 3.50 Km. i/c Pole Shifting
REPLACEMENT OF INVERTER AND BATTERY IN PWD CIRCUIT HOUSE RAISEN, REST HOUSE BADI, SULTANPUR, BEGAMGANJ, GOHARGANJ AND OBEDULLAGANJ DIST RAISEN
POLE SHIFTING AND HEIGHT RAISING OF 11KV, LT LINE AND DTR TRANSFORMER DUE TO CONSTRUCTION OF ROAD FROM GAUKHEDI TO BADJHIRI ROAD (3.30 KM) DIST SEHORE
POLE SHIFTING AND HEIGHT RAISING OF 11/33 KV, LT LINE AND DTR TRANSFORMER DUE TO CONSTRUCTION OF ROAD FROM SEMRADANGI TO BARKHEDA SUKHAL DIST SEHORE
SHIFTING OF EXISTING, 11 KV LINE, LT LINE AND DTR HEIGHT EXTENTION AT DIFFERENT LOCATION DUE TO ROAD WINDING FROM BHOURA CHOPNA SATALDEHI ROAD AT DISTRICT BETUL
PROVIDING CHANGEOVER OTHER ELECTRICAL PROTECTIVE GEAR FOR GROUND FLOOR ELECTRIC PANEL ROOM AT COLLECTRATE NARMADAPURAM DISTT NARMADAPURAM
PROVIDING ELECTRIFICATION S/R WORK IN COLLECTOR BUNGLOW BETUL DIST BETUL
ZONAL ELECTRIFICATION INSTALLATION MOW DEPOSIT RESTORATION / RENOVATION TO RB AND NRB AT BLOCK MULTAI, AMLA, SHAHPUR, GHODADONGARI, AATNER, BHAISDEHI DIST. BETUL MP
Constn. of Ratwada to Sail road Gram Panchayat Ratwada, Length 0.37 Km., Constn. of 01 Row HPC near Gopal Yadav, Shakher Yadav khet at village Bhiladiya Kalan. 1st Call, PAC Rs. 2.54 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Co
Strengthening work of Gram Jhirniya Sultanpur road to Baniyakhedi Marg length 4.60 km.
Strengthening work of Durga Nagar Sarswati School to Gurariya Chidoriya Bhoriya road length 6.30 km.
WW, CW, DISTEMPERING AND PAINTING WORK AT RESIDENTIAL QUARTERS NAVLAKHA HAT MAIDAN UNDER HOLKAR SECTION INDORE