Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
4,390 results • Latest
BT Paitch Repair Works On Various Roads Under Sub Dn. No.1 Bhind
Tiles work, bathroom renovation work, doors, windows and Aluminium work in different Qtrs. Of JEC section Jabalpur.
BT Paitch Repair Works On Various Roads Under Sub Dn. Lahar and Road Lahar
Metal Collection For P.R. Work On Various Roads Under Sub Dn. No. 1 Bhind
Construction Of Gaushala at Alampur Lahar Sub Division Bhind (MLA Fund Deposit Work)
Construction Of Community Hall at Ward No. 10 Near Vankhandeshwar Temple at Sub Dn. Lahar Distt. Bhind (MLA Fund Deposit Work)
Construction Of Community Hall at Taleswar Temple, Bhatantal at Sub Dn. Lahar Distt. Bhind (MLA Fund Deposit Work)
Maintenance Work at Collectorate Building Bhind (M.P.)
BT Renewal Work On Various Road Under Sub Dn. No.1 Bhind
BT Renewal Work On Various Road Under Sub Dn. Gohad (Total Length 18.29 K.m.)
BT Renewal Work On Various Road Under Sub Dn. No.2 Bhind. (Total Length 10.07 K.m.)
AR, SR, MOW Work as per requirement Under Sub Dn. Mehgaon
AR, SR, MOW Work as per requirement Under Sub Dn. Road Lahar
B.T. Renewal work Padlyamata to Dugya road length 3.72 km PAC 83.86 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 90 days excluding R/S
Strengthening of road from Pisanhariki Madhiya to AndhmookChouraha, Jabalpur.
CONSTRUCTION TO RAJGARH-KALIPEET-SAWANSDA-KILA AMERGARH- GHODAPACHAD ROAD With providing pole shifting and height raising of 33KV,11 KV, LT LINE and DTR shifting PAC RS. 8681.97 LACS First call
B.T. Renewal work Devlisanga to Sonkheda road Ch. 00 to 4800 length 4.80 km PAC 100.07 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 90 days excluding R/S
Repair work of Bhaisana Jod To Gehukhedi road length 1300 mtr. (2nd Call)
Construction Work Of Bag Ka Pura To Bhogiram Ka Pura Hokr Kanchanpur Pancholi Road Length 5.00 Km. i/c Pole Shifting
Construction Work Of Beelpur To Malhan Ka Pura Via Gher Road Length 3.50 Km. i/c Pole Shifting
PBMC WORK AT BODA PACHOR ROAD LENGTH 9.48 K.M PAC Rs. 327.70 lakh (2nd Call on Road and Bridge SOR 11/04/2025 Period 60 Month i/c r/s
PBMC Work Bhagwatipur to Malawar road Length 4.60 Km, Shamsherpura to Gangahoni road length 3.60 km, Salepura to Kadiyahat road length 4.00 km, Khoyari Mahadev Mandir approach road length 0.60 km, Kanarkhedi to Parwati Bridge road length 1.50 km
Annual repair work of Govt. Residential Building F and Above Under Sub Division Rajgarh
Zonal B.T. Patch repair work Under PWD (B and R) Division Rajgarh PAC 50.00 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 180 days including R/S
B.T. Renewal work Datagram To Kila Amargarh road ch. 10000 to 18600 length 8.60 km PAC 160.66 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 120 days excluding R/S
B.T. Renewal work Eklera to Kamalpura road Ch. 0 to 4240 length 4.24 km PAC 90.69 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 90 days excluding R/S
B.T. Renewal work Harlay Nuniyahedi Ranjitpura road Ch. 00 to 2400 and Ch. 3790 to Ch. 7120 length 5.73 km PAC 120.65 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 90 days excluding R/S
B.T. Renewal work Sultaniya to Babaldi road length 3.58 km PAC 80.77 lakh First Call on Road and Bridge SOR 11/04/2025 Work Period 90 days excluding R/S
auction of various unserviceable Scrap Matrial kept in Public Works Department Bridge Construction Sub-Division Satna Store
ANNUAL REPAIR WORK FOR THE YEAR 2026-27 UNDER PWD BRIDGE CONSTRUCTION SUB DIVISION NOWGONG
ANNUAL REPAIR WORK FOR THE YEAR 2026-27 UNDER PWD BRIDGE CONSTRUCTION SUB DIVISION SAGAR
ANNUAL REPAIR WORK FOR THE YEAR 2026-27 UNDER PWD BRIDGE CONSTRUCTION SUB DIVISION DAMOH
Strengthning of Nagod Unchehra Road to Pathraundha Road Length 1.20 km, under Sub Division Nagod
Strengthning of Bamahauri Approach Road Length 0.80 km, under Sub Division Satna
Strengthning of Singhpur Approach Road Length 1.10 km, under Sub Division Nagod
Estimate for Proposed Bridge/New work Survey for the year 2026-27 under PWD Bridge Construction Sub Division Nowgong (M.P)
Estimate for Proposed Bridge/New work Survey for the year 2026-27 under PWD Bridge Construction Sub Division Sagar (M.P)
Construction of Submersible Bridge Across Sukhnai River at KM 1/7 on Anganbadi Kendra Kramank-02 (Gram Panchayat Uprara) Towards Aafatpura Road District Tikamgarh.
Providing Comprehensive Maint. and Operation of 200 KVA 11/0.415KV Transformer, Sub Station and Control Pannel at Distt. Court Building Khandwa.
Maintanance/Repair/Renovation Work in PWD Rest House Building at Shahpura, Shahpur and Sakka under PWD (B/R) Sub Division Shahpura (1st Call)
Annual Repair/Special Repair/MOW and Other Deposit Work of Govt. Rssidential and Non Residential Buildings under PWD (B/R) Sub Division Dindori (1st Call)
A/R, S/R Work as per for Requirement in Residential Building Under Sub Dn. Gohad District, Bhind (M.P.)
Maintenance Patch repair work on Various Roads Under PWD Sub Division Mehgaon Distt. Bhind (M.P.)
A/R, S/R Work as per for Requirement in Non Residential Building Under Sub Dn. Gohad District, Bhind (M.P.)
Various AR, SR, Deposite, MOW, Anurakshan Work in Govt. Non Residential Building Section Civil Line , under Sub Division Satna
A/R, S/R Work as per for Requirement in Non Residential Building Under Sub Dn. Mehgaon District, Bhind (M.P.)
Various AR, SR, Deposite, MOW, Anurakshan Work in Govt. Residential Building in Section Civil Line , under Sub Division Satna
Repair of Diesel Generator Set No 3 of 63 KVA Installed at Collectorate Building Premises Near Canteen Cafe at Indore
Electrification work of A/R, S/R, Original Work / MOW / Renovation / Deposit work of Residential / Non Buildings at Collectorate Section E/M Sub-Division Indore.
Electrification work of A/R, S/R, Original Work / MOW / Renovation / Deposit work of Residential / Non Residential Buildings at Khargone and Bhikangaon Section E/M Sub-Division Khargone.