Loading…
Loading…
421 results • Latest
Preparation of Details Project Report for Purbabishnupur-Raidighi Road - from Ch. 0.00 kmp to 0.665 kmp, Ch. 1.3303 kmp to 1.670 kmp etc
Preparation of Details Project Report for Garia-Mathurapur Road - from Ch. 37.00 kmp to 37.449 kmp, Ch. 37.865 kmp to 38.761 km etc
Annual Maintenance Estimate of Electrical installation in the campus of State central library---Annual Comprehensive and preventive maintenance of different type Air conditioning machines at State Central Library, Kolkata.
Replacement of Old damaged Distribution Boards under the jurisdiction of R G Kar MCHES-I
Day to day operation of 2 Two nos. Bed Cum 15 Passenger Lift for 3 three shifts installed at Central Block and Birla Block of Chittaranjan Seva Sadan, COGCH, Kolkata. for the period of three years
Day to day operation of 2 (Two) nos. Bed Cum 15 Passenger Lift for three shifts installed at Gplus5 storied Mother and Child Hub Building of Chittaranjan Seva Sadan, COGCH, Kolkata.for the period of three years