Loading…
Loading…
4,002 results • Latest
Annual maintenance work for Pump with Control Panel at Open Air Theatre Uttirna 1A Reformatory Street Alipore Kolkata 27 during the year 2025 2026
Repair and painting of the outside Both left and right side of IPS officers residence building at 12 no Belvedere Road Kolkata 700027 during the year 2025 2026 2nd Call
Repair and painting works at the Residential Quarter of ADM Bungalow 2nd floor Right side quarter during the year 2025 26
Installation of wooden cabinets at newly allotted Reserve office under WBPD at 1st floor of Bhabani Bhawan main building Alipore Kolkata 700027 during the year 2025 2026
Repair and renovation of Server room of Next Generation ERSS WB Unit at Ground floor of four storied Barrack building beside the left side of stair case at Alipore Police lines Alipore Kolkata 700027 during the year 2025 2026
Repair and renovation of office chamber of DIG P and W_ WB Room no_02 ground floor of Bhabani Bhawan main building Alipore Kolkata 700027 during the year 2025_2026