Loading…
Loading…
113 results • Latest
Special repairing to the EI work including urgent Shifting of Old-Floor level 3Ph BBC to another place and rerouting of existing PP connection at SNCU, Arambagh, PCSGMCH(Electrical Work).
SITC of inverter and UPS system for power backup at CMOH Chamber, VC room, two nos Meeting hall and Dy- III CHAMBER including necessary electrical work at Administrative Building, DFW Building and Office Premises, Suri in the district of Birbhum, RN2
Emergent Repair Works to DRS Building (Roof Treatment by APP and Stair Room Repair) under CMOH Burdwan, Purba Bardhaman under Burdwan Division, P.W.D.
Patch Repair and Maintenance work from Ch. 38.00 Kmp. to Ch. 55.500 Kmp., in stretches of Burdwan-Katwa Road (SH-14) belongs to Katwa Sub-Division, P.W.D. under Burdwan Division, Purba Bardhaman.
Repairing of Burdwan Katwa Road to Burdwan Suri Road via Palitpur from Ch 0.50 kmp to Ch 1.50 kmp and Ch 2.00 kmp to Ch 4.00 kmp by WBM, Pothholes repairing 20mm Premixed Carpet and Seal Coat Under Burdwan Division P.W.Dte.
Construction of Common Collection Point CCP for Bio Medical Waste Management (BMW) of MMC and H along with development of front yard under Midnapur Division, P.W.D. Civil Work, Project ID HF252649642S000