Loading
Loading…
Loading…
1,08,168 results • Latest
Repairing and rewinding of horizontal and submersible pump motor including allied works (Phase-II).
Construction of B/wall in PCC 1-5-10 at RD 1/193 to 1/203.
DEPOSIT-Annual maintenance contract of street lights and Highmast lights at govt medical college ,Thrissur Campus for a period from 01-04-2026 to 31-03-2027-Electrical maintenance work-General Electrical Work
AS PER BOQ
C/o PCC Retaining wall with 1 -5-10 at RD 4/770 to 4/780.
AS PER BOQ